Mapa mental
Chapter 23 - Software Development
Contenido del mapa
Chapter 23 - Software Development
Waterfall Model
- "Once development starts, it is carried through to the end"
- Alternatives
- Prototyping
- Rapid Application Development (RAD)
- Advantages
- Greater communication with the end-user
- Fact finding to establish the requirements
- Disadvantages
- Mis-interputations may only be realised at the end
- Alternatives
- 7 Stages
- Analysis
- Design
- Software Development
- Testing
- Installation
- Review
- Maintenance
- Accepted System
- Installed
- Review
- Test Results
- Installation
- Working System User Guides
- Testing
- Design doc and Test Plans
- Software Development
- Design
- At the end of each stage item called a DELIVERABLE must be SIGNED OFF
- Analysis
- "Once development starts, it is carried through to the end"
Prototype Model
- Working model that serves for future development
- Evolutionary Prototyping
- May evolve into the final system
- Throwaway Prototyping
- Like waterfall used to develop a working system
- Evolutionary Prototyping
- Working model that serves for future development
Información
- Descripción
- Mapa Mental sobre Chapter 23 - Software Development, creado por bboyd6351987 el 13/01/2015.
- Creado por
- bboyd6351987
- Visitas
- 3
- Valoración