SAB4#43 Scope Levels
  1. Control Account
    1. Work Package 1
      1. Activity 1
        1. Activity 2
        2. Work Package 2
          1. Activity 3
            1. Activity 4
              1. A distinct, scheduled portion of work performed during the course of a project
              2. The work defined at the lowest level of the WBS for which cost and durtion can be estimated and managed
              3. A management control point where is possible the analysis of work performance data regarding costs, schedule and scope.
              4. Deliverable