  1. Activity

    • PMI considers an activity to be a particular piece of work scheduled for the project.
  2. Work package

    • The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
  3. Control account

    • Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.

Imágenes y archivos del mapa

  • SAB7#043_SCOPE_LEVELS
  • SAB7#043_SCOPE_LEVELS

Información

Descripción
Mapa Mental sobre SAB7#043_SCOPE_LEVELS, creado por David Hernandez el 10/09/2015.
Creado por
David Hernandez · sep 2015
Actualizado
5 sep 2018
Visitas
6
Historial
  • Creado por Jonatan Rodríguez · 10 sep 2015
  • Copiado por David Hernandez · 10 sep 2015
Valoración

Más sobre Work Breakdown Structure

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué deberíamos añadir?