Bored Piles Construction
Size can be varied
- Suits different ground conditions
- Allows for stronger foundations
High cost (compared to driven piles)
- More material needed
- More wastage to get rid of
Defects can occur during construction
- Cracking leads to weaker pile strength
- Costly to Replace
Suitable for Urban Conctruction
- Lower noise - less effect on surrounding buildings
- Less vibration - less effect on surrounding buildings
Construction can be completed quickly
- Machinery is mobile and can be moved quickly to bore holes
- More holes can then be poured at a time.
- Machinery is mobile and can be moved quickly to bore holes
Soil can be tested before construction
- Allows suitability of construction method to be assessed.