Mold Flood Alleviation Scheme
- Constructed in 2004/2005
- Floods in Mold
- 2000
- 1976
- Causes
- Sustained rainfall meant high groundwater levels
- Rainfall in some places was up to twice as much as the monthly average in one day (75mm)
- Insufficient hydraulic capacity under Leadmill Bridge
- Narrow downstream channel near to rugby pitch
- Options considered
- Replace Leadmill Bridge
- Create upstream storage reservoir
- Pumping floodwater via the Millwr Tunnel
- Teinstating floodplain around Leadmill Bridge
- Aimed to protect again a 1 in 200 year flood
- Soft defences
- Construct an earth embankment made with imported clay
- Water can't get through clay
- Issues
- Keeping away from river due to poor ground stability
- Maintain public right of way along riverside
- Minimise land take but ensure embankment can be maintained
- High voltage overhead cables needed to be hieghtened
- Avoid upsetting any animals
- Construct an earth embankment made with imported clay
- Hard defences
- Raise existing defenses with part wall, part embankment
- Issues
- Needed to divert a main gas pipe
- Need to bypass river for work to proceed
- Provide temprary bund to allow flood water past excavation if overpumps insufficient
- Reuse all excavated material on site due to high removal costs
- Landscaped to maintain rugby pitch
- Lay additional drainage due to compaction from construction traffic
- Fish rescue
Groups involved
- Environment agency
- Local councils
- Local action groups
- Uk Resilience
- UK Health Agency
- National Flood Forum
- Red Cross
Información
- Descripción
- Mapa Mental sobre River Managment Case Studies, creado por nicolaswarbrick el 16/04/2014.
- Creado por
- nicolaswarbrick
- Visitas
- 15
- Valoración