SAB5#22_Methods of selection project

Eric Martinez Español

SAB5#22_Methods of selection project

Contenido del mapa

SAB5#22_Methods of selection project

  1. Benefit measurement methods

    • Murder board
    • Peer review
    • Scoring models
    • Economic models
      • You can choose one or more of these.
      • Present Value
        • The value today of future cash flows. Avoid confusing Present value and Planned value
      • Net present value
        • Present value minus cost over many periods
          • The project with the greatest NPV is selected
      • Internat rate of return (IRR)
        • The higher is the better
      • Payback period
        • Select one with the shorter payback period
      • Cost - benefit analysis
        • Benefit/cost Benefit cost ratio should be greather than 1
          • Revenue is not the same as profit. If benefit cost radio > 1 then  benefits > costs. if benefit cost radio < 1 then benefits < costs. if benefit cost radio = 1 then benefits = costs.
      • Economic value added (EVA)
        • The project returns to the project more value than the initiative cost? Is not the same as Earn Value Analisys
        • The project returns more value than the initiative cost?
      • Opportunity cost
        • Is the value of the project not selected
          • Project A $45000 Project B $85000 Project Selectd = Project B Opportunity cost = $45000
      • Sunk cost
        • Expended cost
          • Is the over cost of the project and not should be considered when deciding whether to continue a troubled project
      • Law of Dimishing returns
        • A certain point, adding more inputs will not increase productivity
      • working capital
        • Is the amount of money the company has available to invest
      • Depreciation
        • Straight line depreciation
          • The same amount of depreciation is taken each year
        • Accelerated depreciation
          • is faster than straight line depreciation
          • Double declining balance
          • Sum of the year digits
  2. Constrained optimization methods

    • Linear programming
    • Integer programming
    • Dynamic programming
    • Multi - objective programming

Imágenes y archivos del mapa

  • SAB5#22_Methods of selection project

Información

Descripción
Una empresa utiliza distintos metodos de evaluacion de proyectos para seleccionar un proyecto.