¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

CAPABILITY MATURITY MODEL

dalpz25 Español

Contenido del mapa

CAPABILITY MATURITY MODEL

  1. Provides a description of how the organization or one of its aspects might look at different stages of growth.

    • They are focused on transforming the organizational environment in wich best practices are performed.
      • These models give little guidance on the specific steps that should be taken to improve and progress up the maturity levels.
  2. Management System Maturity Model

    • 1. Initial
      • Business processes are characterized as ad hoc, and even chaotic.
    • 2. Repeatable Basic Approach
      • Basic process management controls are established to manage results and the necessary process discipline is in place to repeat earlier successes.
    • 3. Defined Systems Approach
      • Business processes are well-defined, understood, and integrated into a "systems" model of how the business operates.
    • 4. Managed Continuous Improvement
      • Processes are well integrated across the organization and the relationship of process performance to customer satisfaction and value is well understood.
    • 5. Best In Class
      • A well-designed methodology for managing process improvement has been established and the company has optimized its organizational structure,culture, and systems.
  3. Model to better understand levels of maturity of a business system

    • Maturity of the company's business environment will have an impact on its ability to successfully implement process improvement efforts.
    • An effort to improve processes is probably futile if the very basic elements that are needed to suppot effective process management are not in place.
    • Companies need to implement effective quality management and process management systems before any serious improvement initiative is considered.
  4. CMM Level 1 to 2

    • Level 1
      • Is described as dysfunctional, with minimal or no processes in place.
    • Level 2
      • Organiztion usually begins by focusing on the documentation and the redesign of major core business processes.
    • Appropiate process improvement models are:
      • The Plan-Do-Check-Act (PDCA)
        • The PDCA cycle is a flexible, simple approach to address corrective action in the workplace.
      • Problem solving is another appropiate model to use in an unstable business environment.
        • These three process improvement models will drive the organization to defining processes and stabilizing them.
      • Customer Satisfaction data as a driver for improvement encourages a priority for forward facing activities that provide immediate gains where it counts most.
    • Organization may be experiencing unpredictable or unstable processes wich are poorly controlled.
  5. Level 3 to Level 4

    • Level 3
      • Is represented as a developing system
    • Processes are well defined and the organization is now proactively managing processes to meet identified customer needs.
    • At this level of organizational maturity, more sophisticated process improvement techniques become effective:
      • Lean
        • Systems approach that seeks to eliminate all waste and minimize any disruption to the smooth flow of products and services to the customer.
      • ISO family of standards
        • Once precesses across the organization are standardized, the organization is in a position where it can successfully apply for registration and auditing to a strict system performance standards such as ISO.
      • National Baldrige type performance excellence models
        • Participation in a national Baldrige type performance excellence model guides the maturing organization to an overall systems perspective.
      • Cost of Quality
        • Cost of Quality becomes a viable approach to identifying priority areas for improvement.
      • Six Sigma Define-Measure-Analyze-Improve-Control (DMAIC)
        • At level 3, processes are stable enough that Six Sigma tools for assessing and reducing variability in product and service outcomes using the DMAIC improvement cycle.
  6. Level 4 to Level 5

    • Level 4
      • Organization reflects a reliable ability to gather quantitative data on the performance of projects and processes.
    • The maturing organization measures and controls processes through strategic planning, feedback loops and continous improvement.
    • Cross-functional improvement techniques:
      • Supply chain management
        • As an improvement method assumes that the individual components of the supply chain are effectively and efficiently manged.
      • Quality Function Deployment
        • Is a technique used to identify external customer needs and to translate those needs into internal technical requirements, processes, procedures and control plans.
      • Design for Six Sigma
        • As a complex design function, requires that the organization have a clear vision of the future and that they can effectively translate that vision into operational reality.
    • Few companies achieve a World Class level 5 system where processes are continuously improved using quantitative measures.
  7. Level 2 to Level 3

    • Level 2
      • Is represented as the Awakening System.
    • The organization begins to focus on a project based improvement approach.
    • Improvement methods that are effective at this level might be:
      • Decision making
        • There is a concerted effort to organize quantitative data into patterns from which reliable observations can be made.
      • Quality Management System
        • Is the precess of establishing policy and objectives with regard to quality and then directing and controlling the activities necessary to achieve those objectives.
      • The state level Baldrige Performance Excellence model
        • Is another system approach to organizing processes into an enterprise wide, interdependent whole.
      • Management Audits
        • Are another way to begin viewing disparate processes as a system of interacting communication channels.

Información

Descripción
Mapa Mental sobre CAPABILITY MATURITY MODEL, creado por dalpz25 el 03/10/2015.
Creado por
dalpz25
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?