Off Site Construction (OSC)
Contenido del mapa
Off Site Construction (OSC)
what are the advantages?
- Controlled facility
- Fuster construction
- Lower construction waste
- Higher Quality
- Higher safety
- More susteinability
- Parallel construction activities
Methods
- Construction-based Prefabricated components (PC´s)
- Panelized construction
- Modular integrate construction (MiC)
Challenges
- Transportation and logistics
- Construction-Supply Chain managment (OSC-SCM)
- ranks top journals on OSC-SCM
- Automation in Construction
- Journal of Cleaner Production
- Journal of Construction Engineering and Management
- Canadian Journal of Civil Engineering
- Construction Management and Economics
- ranks top journals on OSC-SCM
- Installation of mechanical, electrical, and plumbing (MEP) modules
- Project delays
- Cost overruns
Stages
- Design
- Main problems
- Contract managment
- Structural design
- Design for waste reduction
- Main problems
- Production
- Main problems
- Production scheduling
- Green production
- Resource allocation
- Main problems
- Logistics
- Main problems
- Inventory managment
- Route planning
- procurement managment
- Main problems
- On site construction
- Main problems
- Crane operation y planning
- Risk managment
- Green construction
- Main problems
- Integrated supply chain (SC)
- Main problems
- SC performance
- Tracking
- Green SC
- Collaborative SC
- Main problems
- Design
Possible solutions to the main problems
- Optimization
- Optimization models for vehicle routing and truck dispatching problems
- Scheduling optimization of crane operations
- Mathematical optimization model to find the near-optimum assembly sequence that minimized the assembly time and cost
- Simulation
- Simulation approaches have been used to simulate complex systems and consider the uncertainty that originated from multiple disruptions at each SC stage
- LCA (Life cycle assessment)
- Estimate greenhouse gas (GHG) emissions generated from using the precast-in-situ construction method
- BIM
- An automated BIM-based approach has been developed that converts two-dimensional computer-aided design (CAD) drawings into a BIM model.
- BIM models have been used extensively in the design stage to improve communication among the multi-disciplined design teams and the other SC members
- Identify the optimum number of sub-modules by using BIM models.
- To find the optimum configurations/compounds of PCs that minimizes production, transportation and installation costs.
- PTS (Position and tracking systems)
- Track PCs during the production and logistics stages.
- AI
- AI methods have been frequently used in decision-making problems characterized by uncertainty
- Game theory
- Game theory model to design a win-win incentive mechanism to improve PCs’ quality, productivity, and sustainability
- Hybrid methods
- Hybrid approach to finding the optimum structural design of precast connections using artificial neural network
- Optimization