SAB8 #47 Controlling Scope

Jorge Ponce Nuevo estudio Español

Contenido del mapa

SAB8 #47 Controlling Scope

  1. Variance analysis

    • This means comparing the data can be collected about the work being done to the baseline. When there is a difference between the two, that’s variance
  2. Actualiza

    • Scope
    • Project Management Plan
    • Baseline
    • WBS (Work Breakdown Structure)
    • WBS Dictionary
  3. It’s how you make sure that you make only those changes to the scope that you need to make, an that everyone is clear on what the consequences of those changes are.

  4. Scope Management Plan

    • Check the Scope Management plan to figure out how to handle the change