Delay Analysis Techniques (DATs)

  1. Delay in Construction Projects

    • Causes of Delay
      • Defective Installation
      • Labour Productivity
      • Inclement Weather
      • Inaccurate Programming
    • Effects of Delay
      • Delay Claim (Compensation)
        • Disputes & Litigation
        • Mutually Resolved Claims
      • Time Implications
        • Longer Project = Longer Overheads
      • Cost Implications
        • Longer Project = Greater Overheads
      • Quality Implications
        • Rushed Completion = More defects
  2. Existing DATs

    • As-Planned vs. As-Built Method
      • Most commonly used DAT
        • Considered unreliable and inaccurate, not recommended for use
    • Impacted As-Planned Method
      • Simple, doesn't require As-Built Programme
        • Major limitations: failure to address changes to critical path of programme
    • Collapsed As-Built Method
      • Includes all Delays on as-built schedule
        • Considered reliable for use in court/dispute (such as BCIPA)
    • Time Impact Method
      • Most Complex DAT
        • Widespread consensus that it is the most reliable DAT available
  3. Obstacles Preventing DAT Usage

    • Lack of Familiarities with the Techniques
      • Indicates Need for Greater Awareness & Training
    • High Cost and Time Associated With Use
      • Simple, inaccurate methods cost less and are therefore favoured
    • Programming without CPM Network
      • PREVENTS use of Accurate DATS
    • Inadequate Project Records
      • Limits use of Accurate DATs
  4. Factors Affecting DAT Selection

    • Most Important
      • Records Availability
        • Indicates better record keeping = more advanced DAT selection = less dispute
      • Type of Baseline Programme
        • Indicates a uniform programme style should be recommended
      • Reason for DA
      • Cost of Project
    • Least Important
      • Skills of Analyst
      • The Amount in Dispute
      • Number of Delaying Evenes
  5. Awareness & Usage of DATs

    • High Awareness & Usage
      • As-Planned vs. As-Built
      • Impacted As-Planned
    • Low Awareness & Usage
      • Time Impact Method
      • Collapsed As-Built Method

Información

Descripción
Mapa Mental sobre Delay Analysis Techniques (DATs), creado por mperry el 06/06/2016.
Creado por
mperry
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?