Mapa mental
Instrument, Approach and Holding Procedures

Contenido del mapa
Instrument, Approach and Holding Procedures
Departures
- Turning Departure
- After completion of the turn, track guidance must be obtained by 10km.
- Straight Departure
- For an instrument departure, the MOC at the DER is 0ft.
- Omni-directional Departure
- The aircraft should climb to 150m before turning.
- Turning Departure
Parallel Runway Operation
- For parallel runways the missed approach tracks must diverge by 30 degrees.
- Where independent parallel runway operations are in progress, the maximum permitted interception angle to intercept the localiser is 30 degrees.
- Penetration of the NTZ requires Controller intervention.
Approaches
- The minimum DA/DH for a CAT 1 ILS is dependent on the category of aircraft.
- ICAO defined instrument approaches: Non-precision, CAT 1/2/3 precision.
- Initial Segment
- From the IAF to the IF
- DR Segment
- A DR segment should be a maximum of 10nms
- The maximum intercept angle to the FAT at the end of the DR is 45 degrees.
- Circling Approach - VM(C)
- A circling approach is prohibited in the entire sector in which a conspicuous obstacle is located.
- The MOC to land is the same for CAT A & B aircraft and the same for CAT C & D aircraft.
- Straight in Non-precision
- The MDA/H will not be less than the OCA/H.
- When within an angle of 30 degrees of the runway centreline, a Non-precision approach is considered to be straight in.
- MSA provides at least 300m obstacle clearance within the approach procedure.
- When within 5 degrees of the FAT an aircraft is considered to be established for an NDB approach
- If the RVR is below limits the aircraft may only descend to the Outer Marker.
- Track Reversal
- A manoeuvre in which a turn is made away from a designated track followed by a turn in the opposite direction to permit the aircraft to intercept an proceed along the reciprocal of the designated track is called a procedure turn.
Missed Approaches
- Initial Phase
- Intermediate Phase
- 2.5% Climb Gradient
- Turns up to 15 degrees
- Ensures 30m obstacle clearance
- Final Phase
Imágenes y archivos del mapa
Información
- Descripción
- (Instrument, Approach and Holding Procedures) Air Law Mapa Mental sobre Instrument, Approach and Holding Procedures, creado por j.gardner el 17/05/2014.
- Creado por
- j.gardner
- Visitas
- 53
- Valoración
