Apuntes
Boscastle Flooding incident- Case study
Contenido del apunte (1)
Página 1
Boscastle Flooding incident
General information
When- 16th August 2004
Where- Cornwall
What- flooding
Why- River Valency and Jordan burst their banks
Causes
1. The climate/previous weather conditions
Hurricane Alex crossed the Atlantic ocean, which in turn caused heavy rainfall and thunder to the south. Cornwall was associated with being a flashy catchment area, previous rain fall caused water logged ground and filled the river. when the 200 mm rain that fell in a four hour period occurred both river Jordan and Valency bursts their banks as they could not hold anymore water.
2. The Harbor
The heavy rainfall increased the sea level, the harbor at boscastle- since it was near the sea- made it an easy accessibility for the water to flood.
3. Impermeable rock
Boscastle roads were concrete, which is an impermeable type of rock this restricted the absorption soil and vegetation as it acted like a barrier between the soil and rain.
4. Boscastle was on a V-shaped valley
Boscastle happened to be built on the confluence between river valency and Jordan, when both rivers burst their banks bostcastle was unlucky as it was in between them. also, the water from the higher ground sloped down into the village further flooding it.
Effects
Cars were swept away
Bridges were washed away
Accommodation providers were forced to shut down
People lost three weeks of income
Responses
Immediate responses
-emergency workers immediately rescued people along the 20mile coastline
seven helicopters rescued around 150 people who were stranded on treees and rofftops
55 residents were airlifted out by the royal airforce
Longer term responses
Bigger culverts were sorted in both rivers
straightend and eepend the river beds
1 newbridge across the river v and widened the channel
river embankments and gabions