UP UP & AWAY
Diapositivas del conjunto (3)
-
- To the west of London have an airport, destinated to carter for 30m passengers a year.
- This aiRport, is a big construction, but always bring special problems: triky bulding techniques, & the need interface with other transport links & to install sophisticated electronics to handle passengers & bagage.
- The man in charge of this logistical nightmare is Tony Douglas.
- Sience 2018, he ran British Airports Authority supply chain. He to, is a manager of a project, mean T5.
- The risk attached to this huge project are so grate that BAA has been forced to tackle in novle ways.
- If the project don´t finish at time, it could take at a whole company down.
-
- First, Mr. Douglas insists that outsourcing to a large management group
- * Secondly, construction is being carried out off-site. The site's physical limitations: it has only one entry point, through which a 12-metre load must be moved every 30 seconds for a period of four years.
- * The solution, logistics of the automotive industry, a large investment in IT and training that no individual supplier would have made.
- *T5 agreement, aims at minimizing bottlenecks and cost reduction affecting large construction sites.
- *Suppliers rely on failures and delay cost.

-
- BAA assumes the risk, placing a sum of caution in a fund.
- Effect: Change the rhythm and culture of the project, allowing employee teams from different suppliers to work together.
- T5 providers are partners who will work in future projects, have an incentive to do a good job.
- Why BAA is not building airports elsewhere?
- They seek to get permission to build an additional track in Stansted.
- Success will surely point to a derivative business that can build other great projects safely and economically.

Información
- Descripción
- Diapositivas sobre UP UP & AWAY, creado por Maria Gonzalez el 15/02/2020.
- Creado por
- Maria Gonzalez · feb 2020
- Actualizado
- 18 feb 2020
- Visitas
- 5
- Valoración