Criteria
Efficiency: Time, Cost, Effort
Efficiency Criteria: Solution complete processing task’s,
Easy to use, functional
Effectiveness: Goal of system met, Accurate, Relevant
Effectiveness criteria: Is the information used complete, relevant
and accurate.
Why make criteria early: To judge the success of the
solution
Evaluation criteria: Is the data provided complete, acurate and relevant?
Influences on effectiveness of project plan
Was the scope clear?
Was the gannt chart updated?
Was there effective communication?
Evaluating The Solution
Evaluation criteria based on if it meets the SRS
Evaluation stratergy
Make a evaluation stratergy which include's timeframes, criteria used to conduct evaluation
Pseudocode
Subroutine: Contained section that can be called from within any part of program
Function: Task used to pass data back to the calling code
SRS
SRS: Description of intended purpose and environment of solution
Diagrams used to show how users interact with system and how data is transformed into information
Non Functional Requirements:
Usability: How easy it is for user to use the solution
Reliability: How long solution can perform its required function in the environment
Robustness: How well solution responds to poor use or inputs
Maintability: How easy solution can be fixed
Portability: Can solution be moved to other environments
Constraints on solution
Economical factors: Budget and scale of project
Technical factors: Security features is the solution fast, How fast can solution run, Does computer have enough room.
Gannt Chart
(Line) Dependency: Task's which depend on
(Diamond) Milestone: Certain stage which must be reached
Use Case
Include: Show's link between use cases
Extends: Shows that the functionallity of a use case contributes to another use case
Testing
Acceptance testing: used to determine if the requirements of a solution have been met.
Usability testing: used to test if the solution is or will be easy to use for the user.
Project
What is in a project: Time Cost effort and the scope
Constraints on the effectiveness of her project plan
Coding issues
Conflict with schedule
Gannt chart update
Información
- Descripción
- Apunte sobre I.T Study Notes, creado por Joshua Susskind el 22/09/2016.
- Creado por
- Joshua Susskind · sep 2016
- Actualizado
- 10 oct 2016
- Visitas
- 2
- Valoración