Test

Om Ch 14- Final

Shelby Reitz 25 preguntas

Hacer el test

Preguntas del test (25)

  1. 1Wheeled Coach insists all of the following tasks are key to successful MRP use except
    1. Astringent quality control.
    2. Bmaterials plan must meet both schedule requirements and facility capabilities.
    3. Cplan must be executed as designed.
    4. Dinventory investment must be minimized.
    5. Eexcellent record integrity must be maintained.
  2. 2Demand for a given item is said to be dependent if
    1. Athere is a clearly identifiable parent.
    2. Bthere is a deep bill of material.
    3. Cit originates from the external customer.
    4. Dthe finished products are mostly services​ (rather than​ goods).
    5. Ethe item has several children.
  3. 3The phrase​ "demand related to the demand for other​ products" describes
    1. Adependent demand.
    2. Ba dependent variable.
    3. Cindependent demand.
    4. Drecursive demand.
    5. Eregression analysis.
  4. 4Dependent demand and independent demand items differ in that
    1. AAll of the above are true.
    2. BNone of the above is true.
    3. Cthe need for​ dependent-demand items is calculated.
    4. Dfor any​ product, all components are​ dependent-demand items.
    5. Ethe need for​ independent-demand items is forecast.
  5. 5Which of the following is not a key benefit of​ MRP?
    1. Aquality increases
    2. Bfaster response to market changes
    3. Creduced inventory levels
    4. Dbetter response times to customer orders
    5. Eimproved utilization of facilities
  6. 6Effective use of MRP and other dependent demand models does not require which of the​ following?
    1. Acost of individual components
    2. Binventory availability
    3. Clead times
    4. Dbill of materials
    5. Emaster production schedule
  7. 7A master production schedule specifies
    1. Awhat product is to be​ made, and when.
    2. Bthe financial resources required for production.
    3. Cthe raw materials required to complete the product.
    4. Dwhat component is to be​ made, and when.
    5. Ethe labor hours required for production.
  8. 8The​ __________ is​ (are) the MRP input detailing which end items are to be​ produced, when they are​ needed, and in what quantities.
    1. Amaster production schedule
    2. Binventory records
    3. Cassembly time chart
    4. Dload report
    5. Ebill of material
  9. 9A master production schedule contains information about
    1. Aquantities and required delivery dates of final products.
    2. Bscheduled receipts for each final product.
    3. Cinventory on hand for each final product.
    4. Dquantities and required delivery dates of all subassemblies.
    5. Einventory on hand for each subassembly.
  10. 10The aggregate plan gets input or feedback from which of the following​ areas?
    1. AAll of the above.
    2. Bengineering
    3. Cfinance, marketing, and human resources
    4. Dprocurement, production, and general management
    5. Ethe master production schedule

Información

Descripción
OM- Final Test sobre Om Ch 14- Final, creado por Shelby Reitz el 22/04/2018.
Idioma
English
Visitas
0
Etiquetas
om- final
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Más sobre Production Planning and Scheduling

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?