¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

PJM 2

M. A. 60 preguntas

Hacer el test

Preguntas del test (60)

  1. 1Which of the following of the design/construction document phases would most likely be the hardest to estimate when setting the Project Schedule?
    1. ADesign Development
    2. BBidding or Negotiation
    3. CSchematic Design
    4. DConstruction Documents
  2. 2The Owner on one of the projects you are managing is pushing you to finalize everything that is required for the building permit. You are only halfway through the Construction Documents phase and most of the finishes have not been chosen yet. The Owner is asking you to _________ the project.
    1. ARush
    2. BFast Track
    3. CShortcut
    4. DAbandon
  3. 3
    In an effort to account for unexpected issues or unpredicted delays that may occur in a project schedule, the Architect or Project Manager will usually include this in the schedule.
    1. AIndemnification
    2. BReconciliation
    3. CContingency
    4. DTermination Clause
  4. 4Which of the following is not one of the five main phase of project delivery for design as listed in AIA Contract B101?
    1. AProgramming
    2. BBidding and Negotiation
    3. CDesign Development
    4. DConstruction Admin
  5. 5In order to help the Owner understand the cost of the construction for a particular project, what should they request from the Contractor based on the construction drawings?
    1. AProject Schedule
    2. BExtended Schedule
    3. CChange Order
    4. DGuaranteed Maximum Price (GMP)
  6. 6In project scheduling, the difference in time between a float path and the critical path is called what?
    1. AFloat
    2. BMilestone
    3. CRaft
    4. DBubble
  7. 7Reducing the critical path reduces the entire construction schedule, and as a result will
    1. Aincrease job cost, decrease overhead
    2. Bdecrease overhead, decrease job cost
    3. Cnot affect job cost or overhead
    4. Dincrease overhead, increase job cost
  8. 8An Owner wants to work with one company for the design and construction of his project. He will be looking for this type of project delivery method.
    1. ADesign/Build
    2. BCM
    3. CDesign/Build Bridging
    4. DIPD
  9. 9In order to keep a project you are managing on schedule, which of the following would be a critical component of your success:
    1. ARequest a retainer before you begin the project
    2. BRequiring your consultants to provide timelines for their portion of the work
    3. CMinimize any code research
    4. DLimit the number of bids you request from Contractors
  10. 10These documents describe the quality of specific building elements, materials, and systems and describe the installation standards for the project. Choose the best answer.
    1. ASpecifications
    2. BShop Drawings
    3. CInstruments of Service
    4. DContract Documents

Información

Descripción
ARCH PJM Test sobre PJM 2, creado por M. A. el 16/05/2019.
Autor
M. A.
Idioma
English
Visitas
32
Etiquetas
arepjmarch
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?