Test
cmg1002 SAQ's
Este test tiene tiempo límite, así que se abre en el reproductor de siempre.
Preguntas del test (88)
1The share of housing finance between owner occupiers and investors were more or less the same in 2015
- AVerdadero
- BFalso
2QBCC is a 'professional body' associated with the residential construction industrt.
- AVerdadero
- BFalso
3Owner-Builders in Qld can take home warranty insurance from QBCC
- AVerdadero
- BFalso
4Rumpus room is a space dedicated for both adults and children for playing games and for engaging in similar activities
- AVerdadero
- BFalso
5Every year more than [blank_start]150,000[blank_end] new houses are constructed in Australia. The vast majority are built by [blank_start]developers on housing estates[blank_end], many of which are found the edges of our cities and towns.
- Adevelopers on housing estates
- B150,000
6Construction-as-machine notion when applied to residential construction brings the following two concepts into focus: a) [blank_start]Efficiency[blank_end], b) [blank_start]Productivity[blank_end]
- AEfficiency
- BProductivity
7"We need to restore a rule of law to the construction industry...There is a culture of thuggery and intimidation and bullying in the construction industry..." This is a [blank_start]political[blank_end] statement which goes to explain a bit about the [blank_start]culture[blank_end] of the Australian construction industry.
- Apolitical
- Bculture
8Franchising is a [blank_start]business[blank_end] relationship in which the [blank_start]franchisor[blank_end] (the owner of the business providing the product or service) assigns to independent people (the [blank_start]franchisee[blank_end]) the right to market and distribute the franchisor's goods or service, and to use the business name for a fixed period of time.
- Afranchisee
- Bfranchisor
- Cbusiness
9Generally, subcontractors need to be [blank_start]licensed[blank_end] in order to undertake work.
- Alicensed
10an easement is the right to cross or otherwise use someone elses land for a specified purpose such as for discharging rainwater to the street
- AVerdadero
- BFalso
11building in timber may be restricted in areas subject to bushfire attack
- AVerdadero
- BFalso
12There are many advantages of buying a house and land package but with so many different options available, the decision-making process can be daunting, especially for first-time buyers. However, there are many hidden surprises too.
- AVerdadero
- BFalso
13some custom builders use architects for the design of their houses
- AVerdadero
- BFalso
14The services of architect can be sought on a [blank_start]percentage[blank_end] fee, [blank_start]fixed[blank_end] fee, or on a [blank_start]hourly[blank_end] basis.
- Apercentage
- Bfixed
- Chourly
15An architect can provide five types of services. List what these services are:
a. [blank_start]feasibility[blank_end] b. [blank_start]concept design[blank_end] c. [blank_start]design development[blank_end] d. [blank_start]construction documentation[blank_end] e.[blank_start]contract administration[blank_end]- Afeasibility
- Bconcept design
- Cdesign development
- Dconstruction documentation
- Econtract administration
16Stroud Homes catchphrase was: "[blank_start]A home that fits the land well[blank_end], [blank_start]fits the family well[blank_end], [blank_start]and fits the budget[blank_end]...[blank_start]We are experts[blank_end] [blank_start]at finding that perfect fit[blank_end]"
- AA home that fits the land well
- Bfits the family well
- Cand fits the budget
- DWe are experts
- Eat finding that perfect fit
17Buying a property (as against renting) could be an emotional decision for many but for property investors, it is an economic decision.
- AVerdadero
- BFalso
18Loans made available by commercial banks are such, the rate at which the principal is reduced is proportional to time payments have been made.
- AVerdadero
- BFalso
19In order to calculate the fortnightly instalments for a loan, it is necessary to know the lending rate but not the loan period.
- AVerdadero
- BFalso
20Type of soil has bearing on the cost of a building
- AVerdadero
- BFalso
21A mortgage loan, also referred to as a mortgage, is used by purchasers of real property to raise funds to buy real estate; by existing property owners to raise funds for any purpose while putting a lien on the property being mortgaged. The loan is "secured" on the borrower's property.
- AVerdadero
- BFalso
22Option analysis is part of the Preliminary Design stage
- AVerdadero
- BFalso
23Concept design stage usually includes the development of a model when possible.
- AVerdadero
- BFalso
24A project brief is not required in all situations
- AVerdadero
- BFalso
25Client approval of concept designs forms an input to the Preliminary Design Stage
- AVerdadero
- BFalso
26A typical house is classified Class 1b building under BCA
- AVerdadero
- BFalso
27The design brief gets updated throughout the different stages of design from concept to preliminary to developed etc
- AVerdadero
- BFalso
28The Building Act authorises the making of Building Regulations about the erection of buildings and other structures
- AVerdadero
- BFalso
29Building permits are required for putting up a fence
- AVerdadero
- BFalso
30The National Construction Code (NCC) is maintained by the Australian Building Codes Board (ACBC)
- AVerdadero
- BFalso
31Performance requirements under the BCA is met by both performance solutions and deemed to satisfy solutions
- AVerdadero
- BFalso
32‘Ceiling heights should not be less than 2.4m in a habitable room’ is a performance solution
- AVerdadero
- BFalso
33Builders who undertake work between $3,300 and $4,000 need not be registered.
- AVerdadero
- BFalso
34Cash deposit to project builders is usually refundable if the project is undertaken by the same builder.
- AVerdadero
- BFalso
35If you are not an owner-builder, generally, the responsibility for covenant and development approvals remains with the builder.
- AVerdadero
- BFalso
36If the building contract is $5,000 the client is entitled to a cooling-off period of 5 business days; however, this is not available if legal advice was sought before signing the contract.
- AVerdadero
- BFalso
37For works up to $20,000 in Queensland, it is legal to obtain a deposit of 10% of the contract sum.
- AVerdadero
- BFalso
38If the contract price is more than $300,000, and if the offsite work is more than 50%, it is not illegal to obtain a deposit of 25% of the contract sum
- AVerdadero
- BFalso
39When seeking a construction lawn, the interest needs to be paid only after the building is completed.
- AVerdadero
- BFalso
40Insurance works on the basis of good faith.
- AVerdadero
- BFalso
41Home warranty insurance policies issues by QBCC, protects the owner for 6yr and 6 months.
- AVerdadero
- BFalso
42An example of shallow foundation is slab-on-grade footings
- AVerdadero
- BFalso
43A strip footing is more suitable for walls that carry a heavier load
- AVerdadero
- BFalso
44A soil investigation report is necessary to decide on the required grade of concrete.
- AVerdadero
- BFalso
45Grade of concrete is used for expressing the strength of concrete
- AVerdadero
- BFalso
46Good compaction of concrete can be achieved by using vibrators
- AVerdadero
- BFalso
47When using mesh reinforcement, it is adequate to the tie the mesh at the ends without any overlapping
- AVerdadero
- BFalso
48When ordering concrete, it is necessary to be concerned about lead times.
- AVerdadero
- BFalso
49DPC is [blank_start]damp proof course[blank_end]
- Adamp proof course
50D20 300 id [blank_start]deformed reinforcement bars with a yield[blank_end] [blank_start]strength of 300MPa[blank_end]
- Adeformed reinforcement bars with a yield
- Bstrength of 300MPa
51QBCC is [blank_start]queensland building[blank_end] [blank_start]construction commission[blank_end]
- Aqueensland building
- Bconstruction commission
52Before concreting a slab-on-ground, it must be inspected by a [blank_start]building certifier[blank_end]
- Abuilding certifier
53According to the Building Code of Australia, the floor height of a kitchen needs to be more than 2.4m
- AVerdadero
- BFalso
54MMC stands for modular construction.
- AVerdadero
- BFalso
55In the construction of wall, to protect timber against water damage, a reflective foil is fixed to the timber frame.
- AVerdadero
- BFalso
56The level of timber treatment required for fencing posts is H4
- AVerdadero
- BFalso
57A single brick thick wall in Australia has a width of 230 mm.
- AVerdadero
- BFalso
58In English brickwork, stretcher and header courses alternate.
- AVerdadero
- BFalso
59Standard size of a metric brick in Australia is 230 x [blank_start]110[blank_end]x [blank_start]76[blank_end] mm, and seven courses of bricks amount to [blank_start]600[blank_end]mm for dimensional coordination purposes
- A600
- B76
- C110
60[blank_start]tie-down[blank_end] and [blank_start]bracing[blank_end] are required to protect structures against racking, overturning, sliding, and [blank_start]uplifting[blank_end]
- Atie-down
- Bbracing
- Cuplifting
61There are three types of wall bracings. These are: 1. [blank_start]sheet[blank_end] 2.[blank_start]angle[blank_end] 3.[blank_start]slat strap and speed bracing[blank_end]
- Aslat strap and speed bracing
- Bsheet
- Cangle
62If the ceiling space is warm and humid, moist air may collect in the roof space and [blank_start]condense[blank_end] on the [blank_start]cold[blank_end] timbers.
- Acondense
- Bcold
63Brickwork over a window is usually supported by a steel [blank_start]lintel[blank_end]
- Alintel
64Working at heights is a risky activity. In order to minimise hazards in the construction of a roofs, it is usual to provide roof [blank_start]edge[blank_end] protection and [blank_start]putlog and bracket scaffolds[blank_end].
- Aputlog and bracket scaffolds
- Bedge
65The purpose of mullion is to provide [blank_start]structural[blank_end] or for [blank_start]decorative[blank_end] purposes
- Adecorative
- Bstructural
66The overhang of a standard roof truss on the two ends is referred to as the [blank_start]eaves[blank_end]
- Aeaves
67One application of glass is for fire resistance. Other applications are: (a) [blank_start]insulation[blank_end] (b) [blank_start]structural[blank_end] (c) [blank_start]solar control[blank_end]
- Ainsulation
- Bstructural
- Csolar control
68Ceramics tiles are more expensive to lay in Australia compared with porcelain tiles.
- AVerdadero
- BFalso
69b. Shop drawings are prepared by architects.
- AVerdadero
- BFalso
70c. A straight flight with a going of 250mm can be built with 8 risers with a floor height of 2500 mm.
- AVerdadero
- BFalso
71d. All houses must have eaves.
- AVerdadero
- BFalso
72The minimum R value for a wall in houses constructed in Brisbane is 4.1.
- AVerdadero
- BFalso
73b. Double glazing a house cost an extra $5,000. The anticipated savings per year is $500. The payback period for installing double glazed windows is 10 years.
- AVerdadero
- BFalso
74c. An architrave is a type of moulding used to cover the joint between the wall and the ceiling.
- AVerdadero
- BFalso
75d. Eaves provide weather protection to windows.
- AVerdadero
- BFalso
76Sir Walters is a buffalo grass
- AVerdadero
- BFalso
77 Couch grass is generally cheaper than Zoysia grass
- AVerdadero
- BFalso
78c. Buffalo grass can be propagated using seeds
- AVerdadero
- BFalso
79User characteristic is an important issue when selecting a turf type
- AVerdadero
- BFalso
80A standard fence cannot be built without obtaining a building permit
- AVerdadero
- BFalso
81A fence is 2.1m high with poles spaced 2m apart. The fence pole holes are 500 mm. This depth would generally be adequate.
- AVerdadero
- BFalso
82Before concreting a driveway, it is not necessary to make an inspection to check the thickness of the slab.
- AVerdadero
- BFalso
83According to Ipswich City Council regulations, it is not necessary to obtain planning permission to build a driveway.
- AVerdadero
- BFalso
84When siting a house, generally, the living rooms should face the [blank_start]North[blank_end], with few windows on the [blank_start]East[blank_end] wall and fewer on the [blank_start]West[blank_end] wall, to minimise the effect of the [blank_start]harsh afternoon[blank_end] sun.
- Aharsh afternoon
- BWest
- CEast
- DNorth
85design is documented through [blank_start]drawings[blank_end] and [blank_start]specifications[blank_end]
- Adrawings
- Bspecifications
86when using project builders, the specifications spell out the [blank_start]list of inclusions[blank_end]
- Alist of inclusions
87You are interested in purchasing a land. The cost of the land is $200,000. You have saved $20,000 which you intend to use as a deposit for the property. What is the loan to value ratio? [blank_start]180000[blank_end]/[blank_start]200000[blank_end] = [blank_start]90[blank_end]%
- A90
- B200000
- C180000
88You own a mortgage free property valued at 400,000. You want to obtain a construction loan of 350,000. What is the LVR? [blank_start]350000[blank_end]/[blank_start]700000[blank_end] = [blank_start]50[blank_end]%
- A350000
- B700000
- C50
Información
- Descripción
- Test sobre cmg1002 SAQ's, creado por Jack Smith el 27/10/2016.
- Autor
- Jack Smith
- Idioma
- English
- Visitas
- 1
- Valoración
- Aún sin valoraciones Valora este test
Más sobre Construction Planning and Stages