¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

Quiz CTAL

João Lucas 6 preguntas Actualizado el 11 feb 2017

Hacer el test

Preguntas del test (6)

  1. 1Which of the following test techniques can detect defects in the requirements specification at the earliest possible time?
    1. AInspection
    2. BPerformance testing
    3. CEquivalence partitioning
    4. DUnit testing
  2. 2You are designing tests for an integrated system that will use three off-the-shelf components to manage a bank's accounts-receivable system.
    You have been given a state transition diagram from the business analysts that shows the sequence of states an invoice moves through from generation to ultimate payment or laic thereof.
    You have also been given a design document from the system architects that shows which tables are used to store various portions of the invoice and its related information.
    You intend to create a set of end-to-end tests that cover all major use cases and work-flows associated with processing invoices. Which of the following is the best solution to the oracle problem for this test?
    1. AUse only the state transition diagram as the oracle, since this should be a black-box test.
    2. BUse only the design document as the oracle, since this should be a white-box test.
    3. CUse both the design document and the state transition diagram as oracles.
    4. DUse neither document as an oracle, but rely entirely on your understanding of the system.
  3. 3Which of the following is a black-box (behavioral) test design technique discussed in BS 7925/2?
    1. AClassification trees
    2. BOrthogonal arrays
    3. CStatement coverage
    4. DState transition diagrams
  4. 4When should standards be applied to testing?
    1. AWhenever useful
    2. BOnly when required
    3. COn all projects
    4. DOn regulated projects
  5. 5Which of the following statements about the IEEE 1028 standard is true?
    1. AA. It requires the use of inspections
    2. BB. It addresses only management reviews and audits
    3. CC. It requires the use of pair programming and pair testing
    4. DD. It defines inspections, walkthroughs, and technical reviews
  6. 6Which of the following statements are correct?

    I. IEEE 1028 is an international standard on reviews.
    II. Early reviews are very cost effective in finding defects.
    III. Review is considered a static testing
    IV. All types of documents can be reviewed (source code, requirements document, test plan document)
    1. AA. I, II and III true
    2. BB. I, III and IV true
    3. CC. I, II, III and IV true
    4. DD. II, III and lV true

Información

Descripción
Test sobre Quiz CTAL, creado por João Lucas el 10/02/2017.
Idioma
English
Visitas
6
Historial
Creado el 10 feb 2017 · actualizado el 11 feb 2017
Etiquetas
ctal-ta
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Más sobre Test Design Techniques

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?