Test
Second (ADSE I) [Quiz]
Crea una cuenta gratis para terminar este test
Guarda tu progreso y consulta tu resultado final.
¿Ya tienes cuenta? Inicia sesión
Preguntas del test (20)
1Defects are less costly if detected in which of the following phases
- ACoding
- BDesign
- CRequirements Gathering
- DImplementation
2User Acceptance testing is
- AWhite box testing
- BBlack box testing
- CGray box testing
- DNone of the above
3Error guessing is a
- ATest verification techniques
- BTest execution techniques
- CTest control management techniques
- DTest data management technique
4Histogram refers to
- ABar chart
- BRun chart
- CPareto diagram
- DCorrelation diagram
5Pareto principle advocates
- A20-80 rule
- B80-20 rule
- C40-60 rule
- D60-40 rule
6Which one is not Structural Testing?
- ARegression
- BParallel
- CAcceptance
- DStress
7Testing comes under which category of cost of quality?
- APreventive
- BAppraisal
- CFailure
- DNone of the above
8Which of the following is not true about Incremental testing?
- ATop-Down approach can be used
- BUse of stubs or drivers are required
- CAll modules need to be completed prior to testing
- DBottom – up approach is also possible
9Which of the following is not a part of test plan?
- AScope
- BMission
- CObjective
- DRisk
10Which one is not Statistical Tool?
- ACause and effect Graphing
- BStratification
- CRun Chart
- DRegression Analysis
11The ‘v’ represent the following term:
- AVerification and validation
- BStatic testing and Dynamic testing
- CBlack box testing and white box testing
- DSoftware development process and software testing process
12Function point is a measure of
- AEffort
- BComplexity
- CUsability
- DSize
13You are told to prepare a report on the most commonly occurring product defects. You review the software defect reports, which categories the defects of coding errors, requirement errors, documentation errors, etc. The best tool to report this information is
- AA histogram
- BA pareto diagram
- CA cause and effect diagram
- DA scatter plot
14A statistical technique to assess, monitor and maintain the stability of a process is
- APareto chart
- BControl chart
- CRun chart
- DHistogram
15The two types of incremental testing approaches are top down and bottom up approach.
- ATrue
- BFalse
16If the measurement taken by the two people are same refers to the terms as
- AReliability
- BValidity
- CCalibration
- DEase of use and simplicity
17Test Readiness review is conducted by the
- AProject manager
- BTest manager
- CQuality assurance personnel
- DUser/Customer
18To which phase will training cost fall?
- AFailure
- BPrevention
- CBuild
- DAppraisal
19You are performing a test to see that it complies with the user requirement that a certain field be populated by using a drop down box containing a list of values. What kind of testing are you doing?
- AWhite box testing
- BBlack box testing
- CLoad testing
- DRegression testing
20Which is the reputed testing standard?
- AM Bridge awards
- BQAI
- CISO
- DMicrosoft
Información
- Descripción
- Hell Aqib Test sobre Second (ADSE I) [Quiz], creado por Muhammad Aqib el 19/06/2019.
- Autor
- Muhammad Aqib
- Idioma
- English
- Visitas
- 231
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test