Important (ADSE I)

Description

Hell Aqib Quiz on Important (ADSE I), created by Muhammad Aqib on 20/06/2019.
Muhammad Aqib
Quiz by Muhammad Aqib, updated more than 1 year ago
Muhammad Aqib
Created by Muhammad Aqib almost 5 years ago
608
0

Resource summary

Question 1

Question
Which of the following statement about composite structure diagram element are correct?
Answer
  • Ports are modeled as small squares
  • Ports appears on the boundary of an object
  • Collaboration element is represented by a rectangle
  • Collaboration occurrences show instances of collaboration

Question 2

Question
Which of the following statements are true about the Subsystem?
Answer
  • Subsystems are smaller systems within a large system
  • A subsystem realizes one or more interfaces. Which define the behaviour it can perform
  • It may be represented as a UML packagcustosche or a set of operations

Question 3

Question
Which of the following situation , aggregation may be appropriate? 1. An object is physically composed of other objects. 2. An object is logical collection of other object. 3. An object can physically contain other objects.
Answer
  • 1,2
  • 2,3
  • 1,3
  • 1,2,3

Question 4

Question
A_________ is represented as a task of zero duration showing an important achievement
Answer
  • Milestone
  • Schedule
  • Project Phase
  • Tracker

Question 5

Question
By default, MS Project 2010 accrues resource costs ______________
Answer
  • On a prorated basis
  • At the start of the project
  • At the end of the project task
  • As soon as the specific task starts in the project

Question 6

Question
In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses
Answer
  • Material
  • Code
  • Work
  • Resource

Question 7

Question
By default, all tasks in MS Project are ____________
Answer
  • Fixed units tasks
  • Fixed duration tasks
  • Fixed work tasks

Question 8

Question
Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task
Answer
  • Increase, Decreases
  • Decreases, Decreases
  • Decreases, Increase
  • Increase, Increase

Question 9

Question
Which of the following task types MS Project dose not considered as effort – driven tasks by default?
Answer
  • Fixed duration
  • Fixed work
  • Fixed units
  • Fixed time

Question 10

Question
MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle
Answer
  • 6
  • 10
  • 11
  • 15

Question 11

Question
Which of the following are elements of the custom groups?
Answer
  • Field type
  • Field name
  • Order
  • Field group

Question 12

Question
Which of the following leveling order delays or splits the task with the highest ID number in the project?
Answer
  • Standard
  • ID only
  • Priority
  • Priority, Standard

Question 13

Question
Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?
Answer
  • Task-total
  • Task-time phased
  • Assignment-total
  • Assignment-timephased

Question 14

Question
Cost performance is the difference between earned value and ____________
Answer
  • Total value
  • Planned value
  • Actual cost
  • Project

Question 15

Question
By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars
Answer
  • Green
  • Blue
  • Orange
  • Red

Question 16

Question
___________ produces information reliably grounded in the observed behaviour of a system
Answer
  • Walkthroughs
  • Verification
  • Validation
  • Testing

Question 17

Question
________ produces value indirectly through information about valuable system behaviors.
Answer
  • Testing
  • Walkthroughs
  • Validation
  • Verification

Question 18

Question
Performing a test is a _________activity
Answer
  • Physical
  • Logical
  • Technical
  • Non-technical

Question 19

Question
Which of the statements about testing principles is true?
Answer
  • Testing resources are limited
  • It is impossible to test everything
  • Testing is based on the design created.
  • Testing begins after the modules are integrated

Question 20

Question
Testing is based on ___________
Answer
  • Design team requirements
  • User requirements
  • Design outputs
  • Code developed

Question 21

Question
Identify the measurement areas of Motorola Quality Policy for Software Development (QPSD).
Answer
  • Delivered defects and delivered defects per size
  • Total effectiveness throughout the process
  • Estimation accuracy
  • Decrease software defect density

Question 22

Question
How can users enter the task information in the MS Project?
Answer
  • Using the Gantt table
  • Importing tasks from Excel or Outlook
  • Importing tasks from Word document or project table
  • Using the Task information dialog box via the Gantt Chart view

Question 23

Question
In which of the following situation, any two tasks can become a predecessor-successor pair?
Answer
  • When they both auto scheduled.
  • When they have a timing relationship between them.
  • When they share resources between them.
  • One cannot Start before another finishes

Question 24

Question
Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.
Answer
  • Structured Analysis
  • Dataflow Diagram
  • Graph designing

Question 25

Question
The project size can be measured by using the Program Complexity Method.
Answer
  • True
  • False

Question 26

Question
Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?
Answer
  • Data Modeling
  • System Elements
  • Data Object or Entities

Question 27

Question
Attributes define the properties of a data object. It may serve which of the following purpose?
Answer
  • Name an instance of the data object.
  • Describe the instance.
  • Make references to another instance in another table.
  • All of the above.

Question 28

Question
Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.
Answer
  • True
  • False

Question 29

Question
__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.
Answer
  • MODALITY
  • CARDINALITY
  • ENTITY

Question 30

Question
The term __________ can be applied to a person, place ,thing ,object or event.
Answer
  • Modality
  • Cardinality
  • Entity

Question 31

Question
Bubbles within a Data Flow Diagram are used to represent data stores.
Answer
  • True
  • False

Question 32

Question
Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?
Answer
  • Control Flow
  • Data Dictionary
  • Cardinality

Question 33

Question
An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.
Answer
  • True
  • False

Question 34

Question
Which of the following defines the relationship among the major structural elements of the program?
Answer
  • Component-level design
  • Interface design
  • Architectural design

Question 35

Question
Which of the following describes how software communicates with system that interoperate within it and with people who use it?
Answer
  • Component-level design
  • Interface design
  • Architectural design

Question 36

Question
The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.
Answer
  • Differential Overview
  • Interaction Overview
  • Partial Overview
  • Activity Overview

Question 37

Question
The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.
Answer
  • Complex Structure
  • Medium Internal
  • Composite Structure
  • Definition Structure

Question 38

Question
The __________ diagram is composed only of packages and the dependencies between them
Answer
  • Namespace
  • Activity
  • Package
  • Use-case

Question 39

Question
Which of the following statements about the use-case model are correct?
Answer
  • The Use-Case model only consists of actors.
  • The Use-Case model allows users to validate the fact that the system will become what they expect.
  • The Use-Case model only consist of use-cases.
  • The Use-Case model serves as a contract between customers, users, and system developers.

Question 40

Question
Which of the following are types of project calendars in MS Project 2010?
Answer
  • Basic Calendar
  • Standard Calendar
  • Task Calendar
  • Resource Calendar
Show full summary Hide full summary

Similar

First (ADSE I) [Quiz 3]
Muhammad Aqib
First (ADSE I) [Quiz 1]
Muhammad Aqib
Second (ADSE I) [Quiz]
Muhammad Aqib
Biological Molecules Definitions
siobhan.quirk
Nazi Germany Dates
Georgina.Smith
01 Long Term causes of the French Revolution
Holly Lovering
FREQUENCY TABLES: MODE, MEDIAN AND MEAN
Elliot O'Leary
Macbeth - Charcters
a.agagon
Biology -B2
HeidiCrosbie
Organic Chemistry
Megan Tarbuck
2_PSBD HIDDEN QUS By amajad ali
Ps Test