1List below three common hand tools and their uses for working with waste pipe and rainwater guttering.
- AMultipurpose saw - cutting waste pipe and guttering
- BPlumb Line – setting out a vertical line
- CChop saw - for cutting pipe
- DScrewdriver – for screws in brackets
- EWire wool - for deburring edges
2State two safety requirements when using hand tools whilst fitting gutter and waste pipe
- ATools must be used per manufacturer’s instructions
- BTools must be well maintained and in good condition
- CSome PPE must be worn
- DYou must start work at 7am
3State three basic maintenance requirements of common plumbing hand tools.
- AEnsure tools are clean and safe to use
- BEnsure all cutting edges/blades are sharp
- CEnsure all moving parts are well oiled and move easily
- DEnsure you buy new tools
4 Which of the following is the maximum recommended spacing for fascia?
- Aa) 0.5m
- Bb) 0.75m
- Cc) 1.0m
- Dd) 1.5m
5When two pieces of guttering are joined together a gap is left between them. State the reason for this gap.
The gap is left to allow the gutter to expand when heated by the outside air temperature.- AVerdadero
- BFalso
6The gradient should fall 1:600 when installing rainwater guttering
- AVerdadero
- BFalso
7The clip in the picture is generally used on which size waste pipe

- Aa) 40mm
- Bb) 110mm
- Cc) 28mm
- Dd) 25mm
8State the size of waste pipe used on a bath
- A40mm
- B32mm
9The clips below are generally used on which of the following size waste pipes
- Aa) 32mm
- Bb) 23mm
- Cc) 46mm
- Dd) 119mm
1040mm diameter vertical waste pipe should have a maximum clipping distance of
- Aa) 1m
- Bb) 1.2m
- Cc) 1.5m
- Dd) 1.8m
Información
- Descripción
- Short exam for unit 108
- Autor
- james crowley
- Idioma
- English
- Visitas
- 2.551
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test