Project Mngt Chapter 7

damimgd2u 59 preguntas 11.242 visitas

Hacer el test

Preguntas del test (59)

  1. 1The risk is highest in the earliest phase of the project life cycle.
    1. AT/F
    2. BAnswer: TRUE
  2. 2Opportunity emerges from favorable project circumstances and risk from unfavorable events.
    1. AT/F
    2. BAnswer: TRUE
  3. 3As risk decreases in the project life cycle, opportunity increases.
    1. AT/F
    2. BAnswer: FALSE
  4. 4Risks can be quantified by multiplying the likelihood a failure will occur by the severity of the failure.
    1. AT/F
    2. BAnswer: TRUE
  5. 5Technical risk is the probability that the project will not perform to the required standards or produce substandard products or have excessive operating cost consumption.
    1. AT/F
    2. BAnswer: TRUE
  6. 6The probability that the investments made to fund the front-end activities will be lost due to project abandonment is financing risk.
    1. AT/F
    2. BAnswer: FALSE
  7. 7One approach to risk mitigation is simply to accept it.
    1. AT/F
    2. BAnswer: TRUE
  8. 8Risk cannot be transferred because ultimately your own project will suffer the consequences if the event occurs.
    1. AT/F
    2. BAnswer: FALSE
  9. 9Contingency reserves require a construction company to hold back some funds in an account just in case something happens that increases the overall project cost.
    1. AT/F
    2. BAnswer: TRUE
  10. 10The highest dollar value of reserves is typically task contingency.
    1. AT/F
    2. BAnswer: FALSE

Información

Descripción
Project Mngt Chapter 7 Test Questions
Idioma
English
Visitas
11.242
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?