¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

14. Plotting

Ella Davies GNAV Inglés 16 fichas

Fichas del conjunto (16)

  1. 1define fixpostion obtained from more than one source combined to establish position
  2. 2what could these sources bevirtual position lines
    radio or radar position lines
  3. 3define pin pointvisual fix of position
  4. 4DRPdead reckoning position
  5. 5define DRPdeduced position. Calculation of AC position using HDG, TAS, RBG ect
  6. 6what symbol is a clear triangleDRP
  7. 7what is the symbol that is a straight line with arrows either sideposition line
  8. 8what is the symbol that is a curved line with arrows either siderange position line
  9. 9what does 1˚ equal in nm60 nm
  10. 10which meridian do you align with when measuring initial trackthe meridian closest to the initial position
  11. 11which meridian do you align the final true track withmeridian closest to the final position
  12. 12which meridian do you align with when finding the average true trackmeridian closest to your middle position
  13. 13what do you do when trying to find the initial radialalign the protractor with any of the airways heading out from the centre of the airfield
  14. 14how do you find the direction of true northfollow the meridians as they all go to true north
  15. 15what do a D infront of the ILS frequency meanthat there is a VOR and DME co-located
  16. 16—

Información

Descripción
GNAV Fichas sobre 14. Plotting, creado por Ella Davies el 14/05/2018.
Creado por
Ella Davies
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?