Small gate

Description

Flashcards on Small gate, created by Jake U on 20/09/2015.
Jake U
Flashcards by Jake U, updated more than 1 year ago
Jake U
Created by Jake U over 8 years ago
9
0

Resource summary

Question Answer
Small gate position (word for word) Step 1 Safely dismount the apparatus wearing all PPE and radio
Step 2 If riding on a new Smeal Pumper, ensure coffin doors are electrically opened - allows for free travel of hose when the vehicle in in motion, apparatus will need to have park brake engaged
Step 3 Retrieve hydrant kit from the driver rear compartment of apparatus
Step 4 Pace hydrant kit near the hydrant in a practical location for big gate
Step 5 Help big gate with the supply line and wait for the ready signal
Step 6 Return to your position in the apparatus and relay the ready signal to the driver and officer
Step 7 At the scene. Safely dismount the unit and uncouple the supply line at the nearest joint
Step 8 Attach the supply line to the appropriate apparatus at the scene
Step 9 If located at the intake connection, open intake drain valve
Step 10 Communicate to the driver of the apparatus that the line is ready
Step 11 Report to your officer for reassignment
Show full summary Hide full summary

Similar

Big Gate
Jake U
Rank Structure Policies
Jake U
Water supply and hydraulics Part 1
Jake U
Water supply and hydraulics part 2
Jake U
Fire behavior (50 cards)
Jake U
A Level: English language and literature technique = Dramatic terms
Jessica 'JessieB
FCE Practice Quiz - B2
Christine Sang
GCSE AQA Biology - Unit 1
James Jolliffe
Of Mice and Men Characters - Key essay points
Lilac Potato
IB Biology Topic 4 Genetics (SL)
R S
A Christmas Carol (Key Quotes)
Samira Choudhury