Software life cycle

Description

Mind Map on Software life cycle, created by Hengelbert Rodas Chala on 21/08/2018.
Hengelbert Rodas Chala
Mind Map by Hengelbert Rodas Chala, updated more than 1 year ago
Hengelbert Rodas Chala
Created by Hengelbert Rodas Chala over 5 years ago
6
0

Resource summary

Software life cycle
  1. Waterfall or linear-sequential model
    1. A series of steps that must be completed in a linear, sequential order.
      1. Easy to use.
        1. Its usefulness is limited
          1. Software model
            1. Analyzes the needs of the end users of the software
              1. Decomposes and organizes the system, algorithms
                1. the source code is implemented
                  1. It is checked to see if it is working properly
              2. V-Shaped
                1. The V-model focuses on activities and correction.
                  1. The relationship between the development stages and the different types of tests facilitates the troubleshooting.
                    1. The tests can be expensive and sometimes not effective enough.
                      1. Software model
                        1. requirements gathering, accept test
                          1. Funtional specifications, integration test
                            1. HIgh level desing, system test
                              1. Low level desing, unit test
                          2. Incremental
                            1. Tasks grouped in small repetitive steps.
                              1. The model is less likely to fail.
                                1. Requires a client involved throughout the course of the project.
                                  1. Software model
                                    1. Requirement, design, implementation and testing phases are completed for each iteration
                                2. Spiral
                                  1. The risk involved in software development is taken into account.
                                    1. Integrates development with maintenance.
                                      1. It's an expensive model.
                                        1. Software model
                                          1. Planing
                                            1. Evaluation
                                              1. Risk analisis
                                                1. Engineering
                                            Show full summary Hide full summary

                                            Similar

                                            Respiratory System
                                            bridget.watts97
                                            GCSE Chemistry C1 - Carbon Chemistry ATOMS, MOLECULES AND COMPOUNDS (Easy)
                                            T W
                                            CHEMISTRY C1 1
                                            x_clairey_x
                                            Economics
                                            Emily Fenton
                                            Cell Organelles and Functions
                                            Melinda Colby
                                            AQA Biology B2 Questions
                                            Bella Statham
                                            GCSE AQA Chemistry - Unit 1
                                            James Jolliffe
                                            Edexcel Additional Science Chemistry Topics 1+2
                                            Amy Lashkari
                                            Whole Number Glossary L1
                                            Lee Holness
                                            Factores Humanos en la Aviación
                                            Adriana Forero
                                            DEV I Part II
                                            d owen