SAB8#130 Risk vs Workarounds
  1. Workaround
    1. A workaround is not a planned response because the problems being addressed were not anticipated ahead of time. Per the name, a “workaround” let’s you “work around” the problem. As soon as it is determined that there is an unanticipated problem, it needs to be addressed, researched and incorporated into the documentation of the project plan
    2. Risk
      1. Contingency plans are developed around those possible issues and they are completed before the threat takes place. These contingency plans should address the objective of the plan, the criteria for activating the contingency plan, the people and responsibilities involved, and the additional details required for implementation.
      Show full summary Hide full summary

      Similar

      A Christmas Carol - Characters
      chloeprincess10
      Shapes of molecules and intermolecular forces
      eimearkelly3
      Hitler's Rise to Power
      hanalou
      Dr Jekyll and Mr Hyde
      Rosie:)
      CHEMISTRY C1 2
      x_clairey_x
      Biology AQA 3.1.5 The Biological basis of Heart Disease
      evie.daines
      Physics P1
      Phoebe Drew
      GCSE AQA Physics - Unit 2
      James Jolliffe
      GCSE REVISION TIMETABLE
      gracemiddleton
      PSBD TEST # 3_1
      yog thapa
      Rossetti Links
      Mrs Peacock