Teamcenter Manufacturing Process Planner

Description

Mind Map on Teamcenter Manufacturing Process Planner, created by María Jose Elvira Leguia Santos on 11/09/2017.
María Jose Elvira Leguia Santos
Mind Map by María Jose Elvira Leguia Santos, updated more than 1 year ago
María Jose Elvira Leguia Santos
Created by María Jose Elvira Leguia Santos over 6 years ago
116
0

Resource summary

Teamcenter Manufacturing Process Planner
  1. Benefits
    1. Accelerate new product introductions
      1. Shorten time to production
        1. Decrease operating costs
          1. Ensure overall product and process quality
            1. Allow engineers, designers and shop floor personnel to collaborate efficiently
            2. Features
              1. Fully integrated product and manufacturing and manufacturing (process, resource, plants) data to concurrently build product and process plans
              2. Summary
                1. NEED
                  1. Get personalized and high quality products in the markets
                  2. STRATEGYS
                    1. Plan anywhere and build anywhere → COMPETITIVE ADVANTAGE
                      1. Using the Manufacturing Process Planner (MPP) → It allows the development of products and manufacturing processes. Implements production improvements.
                    2. Single source of product and process knowledge
                      1. Provites better visibility to oll available manufacturing resources and ensures maximum utilizati´n
                      2. Visual and higlhy dinamyc work instruccions
                        1. Teamcenter MPP has the ability to generate 3D instructions where you can set up installation indications within the plant which allows the reduction of errors. Through a 3D PDF you can give the work instructions to the users of the area. Adobe Reader will be able to access 3D tools such as pan, zoom, rotate and more.
                        2. vTraditionally manufacturers maintain their engineering and manufacturing BOM in disparate systems.
                          1. BEFORE: There were inefficiencies in the designs of the products update frequencies.
                            1. NOW: With the processes of TEAMCENTER platform engineers produced quickly. Updating processes according to the design change.
                            2. Sequencing and design of graphics processing
                              1. the process functionality of graphic design and sequencing operations
                                1. Gantt chart
                                  1. Dependencies
                                    1. The restrictions
                                    2. Pert chart
                                      1. Optimize the squence of operations
                                        1. Improve management
                                    3. Advanced 3D manufacturing process simulation and validation.
                                      1. Offers to engineers a simulation manufacturing
                                        1. This minimizes the risks of production
                                          1. It analyzes virtually multiple stages of manufacturing
                                        2. Analysis and time management of manufacturing process.
                                          1. Provides a complete set of time management solutions.
                                            1. Uses graphics and reports process planners to analyze and validate the time of the activity at various levels.
                                              1. Integrates with weather management standards such as Ticon.
                                                1. Supports lean initiatives ensuring clear visibility to activities
                                                  1. That do not add value
                                                    1. That add value
                                                  2. An intuitive user interface for performing the most complex assembly planning with ease
                                                    1. The dynamic framework used in the interface design provides the ability to comprehensively visualize and analyze various planning decisions
                                                    Show full summary Hide full summary

                                                    Similar

                                                    GCSE PE - 1
                                                    lydia_ward
                                                    Question Words - GCSE German
                                                    lucykatewarman1227
                                                    Romeo and Juliet essay
                                                    Tambo234
                                                    Biological Psychology - Stress
                                                    otaku96
                                                    BYU English 11 B Speedback
                                                    Becky Kopplin
                                                    STUDY PLANNER IGCSE
                                                    Felixus
                                                    GCSE English Language Overview
                                                    philip.ellis
                                                    Structure of the League of Nations
                                                    saskiamitchell.19
                                                    Chapter 18 - Marketing mix(Product & Price)
                                                    irene floriane
                                                    An Inspector Calls - Quotes and Context
                                                    James Holder
                                                    Romeo and Juliet notes
                                                    Faizaan Mohmed