SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT
  1. Project Management Plan
    1. Scope Baseline
    2. Project Charter
      1. High-Level Milestones
      2. EEF´s
        1. Culture, PMIS
        2. OPA´s
          1. Templates, Learned Lessons
          2. Plan Schedule Management
            1. SCHEDULE MANAGEMENT PLAN
              1. Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
              2. Define the processes to plan & control the schedule
              3. Define Activities
                1. List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
                2. Sequence Activities
                  1. Figure out which activities need to come before others and put them in the right order.
                    1. Project Schedule Network Diagram
                    2. Estimate Activity Resources
                      1. Who and what are needed to get the project done.
                      2. Estimate Activity Durations
                        1. Time it will take to do each activity.
                        2. Develop Schedule
                          1. Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
                          2. Control Schedule
                            1. Monitor and Control Changes to the Schedule to make sure that is kept up to date.
                            2. Tools: Expert Judgment, Analytical Techniques, Meetings.
                              1. How you will plan, manage and control the Project Schedule. Must be REALISTIC.
                                Show full summary Hide full summary

                                Similar

                                Ratios Quiz
                                rory.examtime
                                Unit 1 Sociology: Family Types
                                ArcticCourtney
                                C1 - Formulae to learn
                                Tech Wilkinson
                                CPA Exam Sample Questions Pt. 1
                                nedtuohy
                                Themes of Jane Eyre
                                blackfeather1128
                                Revision Timetable
                                katy.lay
                                GCSE AQA Biology Unit 3
                                Gabi Germain
                                Roles of Education
                                Isobel Wagner
                                The Endocrine System
                                DrABC
                                TOK mindmap “Without application in the world, the value of knowledge is greatly diminished.”
                                Gabriela Serpa
                                BM 13 - COMENIUS, HERBART, DEWEY, HÖNIGSWALD
                                christoph wimmer