1The term ______ describes a product produced as part of a project.
- Avariance
- Bscope
- Cdeliverable
- Dwork package
2Scope refers to:
- Aeach level of work that is outlined in a work breakdown structure.
- Bthe end product created as part of a project that is delivered to the client.
- Ctasks that are decomposed into smaller tasks in a work breakdown structure.
- Dthe work involved in creating the products and the processes used to create them.
3_____ involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them.
- ACollecting requirements
- BDefining scope
- CControlling scope
- DValidating scope
4_____ involves reviewing the project charter, requirements documents, and organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved.
- ACreating scope
- BDefining scope
- CControlling scope
- DValidating scope
5_____ involves formalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables.
- ACreating scope
- BDefining scope
- CControlling scope
- DValidating scope
6Creating the WBS is a subprocess associated with the _____ process in project scope management.
- Aplanning
- Bmonitoring and controlling
- Cclosing
- Dexecuting
7The ______ documents how project needs will be analyzed, documented, and managed.
- Arequirements traceability matrix
- Brequirements management plan
- CWBS
- Dproject scope statement
8Generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization is known as _____.
- Avariance
- Bbenchmarking
- Cprototyping
- Ddecomposition
9A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed.
- Arequirements traceability matrix
- BGantt chart
- Cstate transition table
- Dentity-attribute-value model
10A(n) _____ is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project.
- Aproject charter
- Bbusiness case
- Cproject scope statement
- Dwork breakdown structure
11The main technique used in creating a WBS is _____, which involves subdividing project deliverables into smaller pieces.
- Aconglomeration
- Baccumulation
- Cdecomposition
- Dcatalyzation
12A(n) ____ is a task at the lowest level of the WBS.
- Avariance
- Bobjective
- Cdeliverable
- Dwork package
13The _____ should list and describe all of the deliverables required for the project.
- Aproject charter
- Bscope statement
- CWBS
- DGantt chart
14In the _____approach for constructing a WBS, you use a similar project’s WBS as a starting point.
- Atop-down
- Bbottom-up
- Cmind-mapping
- Danalogy
15The _____ approach for constructing a WBS involves refining the work into greater and greater levels of detail.
- Aanalogy
- Bbottom-up
- Ctop-down
- Dmind mapping
16The _____ approach for constructing a WBS starts with the largest items of the project and breaks them into subordinate items.
- Aanalogy
- Bbottom-up
- Ctop-down
- Dmind mapping
17The _____ technique for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks.
- Aanalogy
- Bbottom-up
- Cmind mapping
- Dtop-down
18In the _____ approach, team members first identify as many specific tasks related to the project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS.
- Aanalogy
- Bbottom-up
- Ctop-down
- Dmind mapping
19Mind mapping can be used for developing WBSs using
- Athe analogy approach only
- Bthe bottom-up or analogy approach
- Cthe top-down or bottom-up approach
- Dany approach
20Which of the following is recommended for the creation of a good WBS?
- AAny WBS item should be the responsibility of all the people working on it.
- BA unit of work should appear at only one place in the WBS.
- CEach WBS item should be created assuming that the requirements are inflexible.
- DThe work content of a WBS item is independent of the WBS items below it.
21Scope creep refers to:
- Athe tendency for project scope to keep getting bigger and bigger.
- Bsubdividing project deliverables into smaller pieces.
- Cthe approved project scope statement and its associated WBS.
- Da task at the lowest level of the WBS.
22_____ involves formal acceptance of the completed project scope by the stakeholders.
- AScope validation
- BScope planning
- CScope control
- DScope baseline
23_____ refers to the difference between planned and actual performance.
- ADecomposition
- BVariance
- CScope validation
- DScope creep
24_____ refers to the process of developing a working replica of the system or some aspect of the system.
- APrototyping
- BVariance
- CDecomposition
- DUse case modeling
25_____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them.
- APrototyping
- BJAD
- CUse case modeling
- DRAD
26_____ uses highly organized and intensive workshops to bring together project stakeholders—the sponsor, users, business analysts, programmers, and so on—to jointly define and design information systems.
- APrototyping
- BJAD
- CRAD
- DUse case modeling
Informações
- Descrição
- Information Technology Quiz sobre Scope, criado por Huy Anh Vo em 18-06-2019.
- Autor
- Huy Anh Vo
- Idioma
- English
- Visualizações
- 0
- Etiquetas
- Avaliação
- Ainda sem avaliações Avalie este quiz