work breakdown structure
Conteúdo do fluxograma
Design project
Cut out wooden base
Cut out perspex LED holder on CNC
Fix genie board in place on base
Get astro turf grass
drill holes for LED's in a hollow bar
Cut the needed piece of threaded bar
Get x2 limit switches
dc motor
drill 5mm hole into one end of threaded bar on lathe
add in LEDs
toggle switch
solder all wires and each part
melt on strip heater and bend to shape
connect all wires to the genie board
assemble project
test
make changes
test
final project