  1. 1Software Development Life CycleSoftware Development Life Cycle
  2. 2—An iterative cycle
    Planning
    Business prerequisites are accumulated in this phase. A Requirement Specification document is created
    Analysis
    The feasibility study, Tentative planning, Technology selection, Requirement Analysis are part of the analysis phase.
    Design
    Design phase has two major task to follow :HLD (High-Level Designing),LLD (Low-Level Designing)
    The technical lead will also prepare the PSEUDO Code.
    Implementation
    Coder has now task to do Programming / Coding.
    Developers will develop the actual source code by using the PSUEDO Code and following the coding standards
    Testing & Integration
    Make sure the software works as expected by looking at the requirements - check for errors, bugs and interoperability
    Maintenance
    After the delivery if any problem occurs then that will become a task based problem

Informações

Descrição
FlashCards sobre Sem título, criado por Elysia Moore em 04-07-2019.
Criado por
Elysia Moore
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?