  1. 1Which source or organization promotes a uniform organization system for organizing construction materials specifications and documentation into divisions and sections for projects?Construction Specifications institute
  2. 2What do the horizontal lines on an organizational chart with various positions indicate?Communication
  3. 3Which duties change as a person moves up an organizational chart?Analysis skills increase and communication skills increases.
  4. 4Which position typically writes the subcontract agreements?Project Manager
  5. 5Which position typically forecasts the cost at completion for field activities?Cost Egineer
  6. 6Whicih position typically performs the formwork design calculations?Project engineer
  7. 7Which position typically draws the logical sequences and calculates the activity days?Planning engineer
  8. 8Which position typically assigns the crews, maintains a job diary and schedules subcontractors?superintendent
  9. 9which position typically completes the time card?crew leader
  10. 10which party typically obtains the building permits?project manager
  11. 11which position typically develops the overall project logic network and schedule?project manager
  12. 12Which of the following activities does a millwright perform?Assembles and aligns rotating equipment
  13. 13Which trade operates equipment to place the steel sheet piling?pile driver
  14. 14Which trade assembles and aligns the underground pipe outside the structure?pipe layer
  15. 15which trade applies stucco to the outside of the building?plasterer
  16. 16which trade installs piping and equipment for the fire protection system?sprinkler fitter
  17. 17which trade applies heat-resistant materials to structural steel and sprays refractory material on the inside of steel boilers and high pressure vessels or tanks?fireproofer
  18. 18which trade ties and places the rebar?red busters
  19. 19which of the following trades fits, aligns & installs drain, waste and vent piping?plumber
  20. 20which of the following trades fabricates and erects air distribution duct work?sheet metal workers
  21. 21which of the following trades installs and calibrates pressure and flow gauges?instrumentation filter
  22. 22which trade installs low voltage intercom & security systems?communications electrician
  23. 23Which trade wraps the high pressure process piping and equipment?insulator
  24. 24which trade erects jin poles for making heavy lifts, assembles cranes and attaches slings to the loads for the crane to lift?rigger
  25. 25which trade pours, finishes and polishes floors to bring out the marble chips?terrazzo worker
  26. 26which trade cuts and installs panes of glass in store fronts and glass curtain walls?glazier
  27. 27which trade seals the head and butt joints for the drywall on a commercial project?taper
  28. 28which trade operates the motorized concrete buggies?laborer
  29. 29which trade welds the high pressure process piping?pipe fitter welder
  30. 30what are the components of a job-built that the boilermaker will assemble together?sets structural steel sides, assembles piping, welds water tubes, and sets pumps
  31. 31the welders have associated themselves with numerous trades and have taken on their trade name. Which of the following crafts are the welders are associated with?ironworkers, boilermakers, and pipe fitters
  32. 32When hiring employees which form must they fill out requesting their marital status, number of exemptions and their social security number?w4
  33. 33Which form must be completed by all us citizens?I-9
  34. 34According to the federal government regulations, what is the maximum number of days that a company has to submit the non-United States citizen form to the federal governement?3
  35. 35which of the following posters describes the regulations for wage payment and hours of work for all industries and must be posted at the job site?Fair Labor Standards
  36. 36What is the correct name for the acronym EEOC?EQUAL
    EMPLOYMENT OPPORTUNITY COMMISSION.
  37. 37What is the purpose of the EEOOC law?Prohibit discrimination against individuals due to race, sex, age
  38. 38What is the correct name for the acronym ADA?American with Disabilities Act
  39. 39What is the purpose of the ADA law?Prohibit discrimination against individuals with disabilities
  40. 40What is the correct name for the acronym DBE?Disadvantaged Business Enterprises
  41. 41What do the EEO, ADA, and DBE law have in common?Protection of individuals from employment discrimination
  42. 42What are the additional provisions that were ADDED by the 1991 Civil Rights Act to the exisiting employment discrimination law that allows employees to recover compensatory and punitive damages?Emotional Pain, suffering, inconvenience, mental anguish, and loss of employment
  43. 43What can be recovered by an individual from the officers or managers of a company under the Civil Rights Act of 1991 if a manager is found guilty?The manager can be held personally for awarded damages and lawyer fees
  44. 44What is the name of the act that requires the contractor to pay prevailing wage rates on all federally-funded projects?DAVIS-BACON ACT
  45. 45What is a court order that prohibits a union or contractor to stop certain activities?Injunction
  46. 46What is a dispute between two untions over work activities requiring the contracJurtor to assign the work to one of the unions involved called?Jurisdictional dispute
  47. 47Which document informs the contractor that their proposal has been accepted?Notice of Award
  48. 48Which document informs the owner, that the work on a project will be stopped for failure of the owner to make a progress payment?STOP WORK NOTICE
  49. 49Which document is used to allocate the estimated costs for the items listed and for requesting progress payments?Schedule of values
  50. 50Which document is issued to the contractor for failure to perform according to the specifications?STOP WORK ORDERRRR
  51. 51Which document is signed in agreement by the Owen, A/E and the contractor informing the contractor to modify the agreements terms and conditions?Contract change order
  52. 52Which document is signed in agreement by the owner and the a/e and instructing the contractor to make a change prior to agreeing on the adjustment in scope or price?Change directive
  53. 53Which documents establishes the actual start date from which the beginning of the project is calculated?Notice to Proceed
  54. 54Which documents terminates any liquidated damages from being assessed any further?Certificate of substantial completion
  55. 55According to the AIA documents assumes that the owner through the a/e rejected a claim that the contractor has submitted. What action must the contractor request in writing next?Mediation
  56. 56When is the certificate of substantial completion prepared?END of the construction process
  57. 57Which of the following items is contained in the certificate of substantial completion?A list of items to be completed
  58. 58what is an amount withheld fom progress payment to ensure satisfactory completion of the work called?Retainage
  59. 59According to the project document, which document lists the itemized content required for submitting a contract change order proposal?supplementary conditions
  60. 60According to the project documents, after the signing of the agreement which documents must be sumitted by the contractor within fourteen days of executing the agreement?construction schedule
    and
    schedule of values

Informações

Descrição
FlashCards sobre Project Administration, criado por drcygmz em 21-10-2014.
Criado por
drcygmz
Visualizações
20
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?