  1. 1Schedule development- calculate start and end dates of project activities -> establish the overall project schedule baseline
  2. 2Gantt Diagram- graphical representation of project time scheduling
  3. 3Critical Path Method (CPM)- method used to estimate the minimum project duration and determine the amount of scheduling flexibility (float) on the logical network paths within the schedule model
    -> calculates the project end date
    -> locates critical path
    -> identifies critical activities
  4. 4Contingency (Zufälligkeit) reserves(buffers)
    - justified by presence of forecasting uncertainties (have to be identified)
    -> included with time baseline
  5. 5management reserves- out of project manger´s control
    - dedicated to unexpected, out-of-the-project scope work
  6. 6PERT Method (Program Evaluation and Review Technique)- takes into account the uncertainty -> related to the duration of the activities
    -> calculate the probabilistic expected duration of the project, clarify range of uncertainty
  7. 7PERT Method - 3 pont estimationO: Optimistic time (minimum time required)
    p: Pessimistic time (maximum time required, everything goes wring)
    M: most likely time
  8. 8CPM- calculates float or sacke, identifies critical path
    - uses one value of activity duration
    - used when durations can be estimated with confidence
    - minimizing cost
  9. 9PERT- calculates float or slack, identifies critical path
    - requires 3 estimates of actives duration (O,P,M)
    - used when durations CANNOT be estimated with confidence
    - meeting time targets, estimate percent completion!
    --> projects involving new activities
  10. 10Critical Chain Method (CCM)- plans backward, activities start as late as possible
    - dependencies amongst activities are deepened from resources
    - uses different kinds of buffers
    -> project buffer: total time reserve on projects completion date
    -> resource buffer: resources reservoir for critical path
    -> feeding buffer: time reserve for paths belonging to critical path

Informações

Descrição
Project Managemnt FlashCards sobre Lesson 5 , criado por odessa m em 01-10-2019.