  1. 1How else might lean production be known (2)1. Just-in-Time (JIT), it originated from this in Japan
    2. Lean synchronisation
  2. 2What is the aim of lean production? What is its principle (1)1. To meet demand instantaneously with perfect quality and zero waste
    2. Supplying products with perfect synchronisation with the demand
  3. 3Draw flow-charts for traditional production and lean production approaches (2)See notes
  4. 4If there is a problem in the production system, how will it affect a traditional vs lean production system? (4)1. In traditional approach, if problem occurs in one part of the production system, it would not be immediately visible in other parts of the system as these are isolated from each other by buffer inventories
    2. In the lean approach, if something happens in one part, the effects will be felt immediately in subsequent stages.
    3. This would mean that solving the problem is no longer the sole responsibility of people working in that stage and becomes a job for the entire production line
    4. This increased exposure is one of the defining properties of lean synchronisation as buffers no longer protect the other sections from disruptions
  5. 5Draw and explain the river with rocks analogy of lean production vs traditional production (1)See notes
  6. 6What is the pay-off when using lean production? (3)1. Benefits come at the cost of capacity utilisation
    2. The buffers in the traditional approach allow other parts of the system to continue functioning and thus utilise their capacity if there is a problem somewhere
    3. Higher utilisation does not usually translate into more production as a whole
  7. 7What are the 8 principles of lean production philosophy? Explain each (8)1. DISCIPLINE
    In following work standards, critical for safety and quality
    2. FLEXIBILITY
    To increase people's responsibility to their abilities
    3. EQUALITY
    as one person's problem is really everyone's. Some lean companies mandate the same uniform for everyone regardless of rank in the organisation
    4. AUTONOMY
    delegating responsibility to people so that they can make direct decisions
    5. DEVELOPMENT
    a more capable working force will increase productivity
    6. QUALITY OF WORKING LIFE
    involve people in decision making, increase job security and enjoyment of facilities
    7. CREATIVITY
    an indispensable element of motivation
    8. TOTAL PEOPLE INVOLVEMENT
    staff will take on more responsibility in dealing with the supply chain, recruitment, quality issues, and spending of improvement budgets.
  8. 8What is another important principle in Lean production? What is the Japanese term for this(2)CONTINUOUS IMPROVEMENT - improvement towards the ideal 'instantly meeting demand' with perfect quality and no waste is a never ending process.
    2. 'Kaizen'
  9. 9What is 'waste' in production? (1)1. Any activity that does not add value
  10. 10What percentage of activities in an organisation are directly adding value? (Shown by some studies) (1)5% (1)
  11. 11Give and explain the three Japanese words used to convey the causes for waste (3)1. MUDA: These are activities where no value is added to the production or the customer. Poorly communicated objectives are often the main cause. Not understanding customer requirements is an example cause
    2. MURA: This is lack of consistency. For example, if tasks are not properly documented, when they are performed by different people the results are different
    3. MURI: This means unreasonable demands from resources. Often resulting from poor planning, these can be eliminated by sequencing, scheduling and considering resource loadings in production planning
  12. 12What are the 7 types of waste that are often present in production? (7)1. OVER-PRODUCTION
    Producing more than what is immediately needed
    2. WAITING TIME
    Efficiency measures can be used to find out the idle time of resources. Waiting time of products in the pipeline are somewhat more difficult to calculate
    3. TRANSPORT
    Moving items during the operation does not add value and should be minimised
    4. PROCESS
    Some processes might only exist due to poor design of the product or the process chain
    5. INVENTORY
    Keeping raw material, work in progress (WIP) or finished products is a waste of valuable space
    6. MOTION
    An operator who is moving around a lot does not necessarily add a lot of value
    7. DEFECTIVES
    Products that do not meet quality requirements are a major waste in production systems
  13. 13What are the four methods for the elimination of waste? (4)1. Streamlined flow
    2. Matching supply and demand
    3. Flexible process
    4. Minimising variability
  14. 14Why is streamlines flow important in lean philosophy? (1)1. Because long process routes are often those where delays and inconsistencies can creep in.
  15. 15Explain how a streamlined flow can be ensured (6)1. All elements of the the throughput time should be closely investigated
    2. Value stream mapping (VSM) is an approach used to create a visualization of the product path from start to finish to identify value-adding and non-value-adding operations
    3. First, the value stream is identified and then the 'current state' map of the process is drawn
    4. The problems are then diagnosed and changes are suggested in a 'future state' map
    5. Another useful suite of tools for streamlining the flow are visual management techniques that employ visual signs, computer screens and simply loghts to convey critical information about the production flow to everyone
    6. The other approach for streamlining the flow is to employ small-scale simple process technologies instead of larger and more complex ones
  16. 16Why might three simple machines processing pats A, B & C be a more robust solution than a complex one that produces all three? (2)1. Because if one of the smaller machines breaks down, then the line will still continue operating at two-thirds effectiveness.
    2. Also smaller machines are easier to move and service
  17. 17Explain how supply and demand can be matched (4)1. By using pull control, it is possible to ensure that no part is produced unless there is a need for it
    2. Using the KANBAN method. In its most basic form, a kanban is a card used by a customer to instruct its supplier to send more items. Usually each kanban corresponds to a single item; so three kanbans signal the need for producing three items
    3. Kanbans serve three purposes:
    a. Instruct the preceding stage to send more
    b. They serve as visual control to show up areas of over population
    c. Reducing the number of kanbans becomes a tool for kaizen
    4. (instead of cards, spaces indicated on the floor or containers may be used)
  18. 18Describe what a flexible process is, give an example (2)1. Responding instantaneously to exact customer demand requires flexible processes that can change what they do and how often they do it without incurring great costs or requiring a long time
    2. Reducing changeover activities are an example of making processes more flexible
  19. 19Give the four methods for minimising variability (4)1. Levelling schedules
    2. Levelling delivery schedules
    3. Mixed modelling
    4. Keep things simple (5Ss)
  20. 20Explain how 'levelling schedules' work (2)1. Keeping the mix and volume of flow between stages at an even flow over time reduces variability.
    2. This would require batch sizes to be decreased and have significant effects on planning and control of the production system
  21. 21Explain how levelling delivery schedules works (2)1. Similar to levelling schedules but for delivery stages instead of production stages
    2. Using smaller batches for delivery keeps the inventory low and also allows production to respond to changes in demand much more quickly
  22. 22Explain how mixed modelling works (2)1. If a batch size of one is achieved (a major challenge in most production facilities), levelling of the production schedule can be extended to sequence the items to create a smooth flow
    2. SEE NOTES for example please
  23. 23Give and explain the 5Ss to eliminate waste from variability (5)1. SORT (SEIRI) Keep what is needed, throw away what is not needed
    2. STRAIGHTEN (SEITON) Position things so that they can be reached when needed
    3. SHINE (SEISO) Keep things clean and tidy
    4. STANDARDISE (SEIKETSU) Maintain uniform operations in the workplace where possible
    5. SUSTAIN (SHITSUKE) Make this a way of life and ensure commitment by all

Informações

Descrição
Manufacturing Operations and Technology FlashCards sobre L#9 Lean Production, criado por Block em 01-05-2014.
Criado por
Block
Visualizações
10
Avaliação

Mais sobre Lean Production

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?