Ch. 9 Reducing Project Duration
Rationale
- Time to market
- Unforeseen delays
- Incentive contracts
Acceleration of Project
- When resources aren't constrained
- Additional Staff
- Outsourcing work
- Scheduling overtime
- Establish a core team
- Do it twice, fast and correctly
- When resources are constrained
- Improve efficiency
- Fast Track
- non critical items run parallel
- Critical Chain PM
- accelerates project completion
- Reducing project scope
- Compromise quality
- Project direct costs
- When resources aren't constrained
Project Cost Duration Graph
- 1. Find total direct costs
- 2. Find indirect Costs
- 3. Sum direct / indirect costs
- Normal times for completing ativities
- Low cost
- Realistic
- Efficient methods
- Crashing
- Shortening an activity / project
- Crash Times
- Shortest possible time a project can be completed
- Crash Cost
- Direct cost for completing an activity
- Crash Point
- Max. time a project can be compressed
Time Reduction and Sensitivity
- Sensitive if several critical or near critical paths
What if Cost is the problem?
- Reduce project scope
- Owner must take more responsibility
- Outsourcing
- Brainstorm cost saving solutions
Project Cost Duration Graph Cont'd
- Assumptions
- Cost - time relationship is linear
- Normal time assumes low-cost, efficient methods
- Crash time represents a limit
- Slope represents cost per unit of time
- All accelerations must occur w/i the normal crash times
- Assumptions