  • Any change to scope must be evaluated for its effects on time, cost, risk, quality, resources an customer satisfaction. No changes to scope are allowed without and approved change request. Do not approve changes if the related work that does not fit within the project charter. You need continuously determinate what is and is not included in the project.
  1. You must plan, in advance, how you will determinate the scope

  2. The scope must be clearly defined and formally approved before works starts

  3. Requirements are gathered from all the stake holders

    • Conducting planning workshops Researching previous project experiences Developing strategies and plans
    • los requerimientos de los usuarios : internos o extrenos
  4. Scope management plan

  5. Project scope statement

  6. Create

    • WBS
      • EDT (español)
    • WBS Dictionary
  7. Determinate all roles and responsabilities

  8. Go back - iterations

  9. Finalize how execute and control

  10. Develop realistic and final PM plan and performance measurement base line

  11. Product scope

  12. Trazability Matrix

Informações

Descrição
Certificacion SCOPE MANAGEMENT Mapa Mental sobre SAB#36_Planning_scope, criado por Maria Gonzalez em 11-04-2015.
Criado por
Maria Gonzalez
Visualizações
5
Histórico
  • Criado por Eric Martinez · 11 abr 2015
  • Copiado por Maria Gonzalez · 11 abr 2015
Avaliação

Mais sobre Plan Scope Management

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?