SAB#36_Planning_scope
- Any change to scope must be evaluated for its effects on time, cost, risk, quality, resources an customer satisfaction. No changes to scope are allowed without and approved change request. Do not approve changes if the related work that does not fit within the project charter. You need continuously determinate what is and is not included in the project.
You must plan, in advance, how you will determinate the scope
The scope must be clearly defined and formally approved before works starts
Requirements are gathered from all the stake holders
- Conducting planning workshops Researching previous project experiences Developing strategies and plans
- los requerimientos de los usuarios : internos o extrenos
Scope management plan
Project scope statement
Create
- WBS
- EDT (español)
- WBS Dictionary
- WBS
Determinate all roles and responsabilities
Go back - iterations
Finalize how execute and control
Develop realistic and final PM plan and performance measurement base line
Product scope
Trazability Matrix
Información
- Descripción
- Certificacion SCOPE MANAGEMENT Mapa Mental sobre SAB#36_Planning_scope, creado por Maria Gonzalez el 11/04/2015.
- Creado por
- Maria Gonzalez
- Visitas
- 5
- Historial
-
- Creado por Eric Martinez · 11 abr 2015
- Copiado por Maria Gonzalez · 11 abr 2015
- Valoración
Más sobre Plan Scope Management