Mapa mental
SAB7#056 Develop Schedule
Conteúdo do mapa
SAB7#056 Develop Schedule
Schedule Management Plan
- Identifies the scheduling method and tool used to create the schedule, and how the schedule is to be calculated.
Activity List
- Identifies the activities that will be included in the schedule model.
Activity Attributes
- Provides the details used to build the schedule model.
Project Schedule Network Diagrams
- Contains the logical relationships of predecessors and successors that will be used to calculate the schedule.
Activity Resource Requirements
- Identifes the types and quantities of resources required for each activity used to create the schedule model.
Resource Calendars
- Contains information on the availability of resources during the project.
Activity Duration Estimates
- Contains the quantitative assessments of the likely number of work periods that will be required to complete an activity that will be used to calculate the schedule.
Project Scope Statement
- Contains assumptions and constraints that can impact the development of the project schedule.
Risk Register
- Provides the details of all identified risks and their characteristics that affect the schedule model.
Project Staff Assignments
- Specifies which resources are assigned to each activity.
Resource Breakdown Structure
- Provides the details by which resource analysis and organizational reporting can be done.
EEF´s
- • Standards, • Communication channels, and • Scheduling tool to be used in developing the schedule model.
OPA´s
- scheduling methodology and project calendar(s).
Project Documents Updates
- Activity Resource requirements, activity attributes, calendars and risk register.
Project Calendars
- Working days and shifts that are available for scheduled activities.
Schedule Baseline
- Approved version
Project Management Plan Updates
- Baseline and Management Plan
Schedule Data
- The collection of information for describing controlling the schedule(Milestones, activities, activities attributes, assumptions and constraints)
Project Schedule
- Gantts, Milestones, Schedule Network Diagrams.
Modeling Techniques
- What-If Scenario Analysis and Simulation
Leads and Lags
- Are used to refine the network analysis to develop a viable schedule by adjusting the start time of the succesor. Lead is to advance and lag is to wait.
Schedule Compression
- Crashing(Adding resources, Works only on CPM and increases risks)and Fast Tracking(Parallel and may result in rework )
Scheduling Tools
- Systems
Schedule Network Analysis
- critical path method, critical chain method, what-if analysis.
Citrical Path Method
- Determining the longest path through the network diagram and it determines the shortest time to complete de project.
Critical Chain Method
- Adds duration buffers that are non-work schedule activities to manage uncertainty.
Resource Optimization Techniques
- Resource optimization techniques to calculate the early and late start and finish dates for the uncompleted portions of project activities. Resource leveling and Resource Smoothing.
Informações
- Descrição
- Project Manager Professional PM - 055 a 110 Mapa Mental sobre SAB7#056 Develop Schedule, criado por Oscar De la O em 05-09-2015.
- Criado por
- Oscar De la O · set 2015
- Atualizado
- 19 fev 2016
- Visualizações
- 0
- Histórico
-
- Criado por David Hernandez · 5 set 2015
- Copiado por Oscar De la O · 5 set 2015
- Avaliação