  1. SOLAR STRUCTURE

    • Photo of solar structure from each side
      • Top, side, front and back view photos
    • Direction of solar structure
      • Take photo with compass or app in cellphone
        • Photo has to be clearly with solar structure in the background
          • Direction: North
            • OK
          • Direction: South, East, Weast
            • Make a plan to fix direction solar structure
  2. DC CABINET

    • Type DC system
      • Take panoramic photo
    • PU
      • Take photo quantity of PUs
      • Check if it is operating
      • Measure voltage of each PU before and after cleaning
      • Measure voltage of each PU before and after cleaning
    • Rectifier
      • Take photo quantity of rectifier
      • Check if it is operating
    • Consumption of site
      • DC system with CSU
        • Take photo in CSU
      • DC system without CSU
        • Measure current of each equipment in breaker
        • Measure voltage in breakers
    • LLVD and BLVD breaker
      • Take photo of breakers
  3. MONITORING

    • No have
      • Recover monitoring
    • Have
      • Configurate parameters
        • Battery capacity
          • 50 Ah/battery
        • Battery shunt configuration
          • Merge
        • LLVD and BLVD voltage
          • LLVD: 45V
          • BLVD: 43.2
        • DC Low voltage
          • 47.5 V
        • Battery charge current coef.
          • 0.20
      • Check Status
        • PU
          • A: 0A
            • Move PU to another slot
              • PU work
                • Problem with DC system
              • PU doesn't work
                • Change PU
          • A > 0A
            • OK
        • Rectifier
          • All working
            • Ok
          • 1 or more aren't working
            • Move rectifier to another slot
              • Rectifier work
                • Problem with DC system
              • Rectifier doesn't work
                • Change PU
        • Battery
          • Check all CB are working
            • 1 or more aren't working
              • Configurate parameters
            • All CB are working
              • OK
  4. BATTERY

    • Cable connection
      • Check if battery is correctly connected
        • Damaged cable
          • Replace cable
        • Damaged terminals
          • Replace terminals
        • Misaligned terminals
          • Tighten terminals
    • Light status
      • Alarmed
        • Reset battery
          • Alarmed
            • Make test battery
              • OK
              • NOK
                • Replace battery
          • No alarmed
            • OK
      • Lights off
        • Measure voltage and current of battery
          • V<47 V , A < 1 A
            • Measure voltage in cables from breakers
              • V > 0
                • Replace battery
              • V=0
                • Check cable and breaker of batteries
          • V<47 V , A >= 1A
            • Charge battery
          • V>47 V , A < 1A
            • OK
          • V>47 V , A > 1A
            • OK
    • Type of battery
      • Different type
        • Replace battery to have same type of batteries
        • Acid
          • Narada
          • Shoto
          • BSB
          • Leoch
        • Lithium
          • Shoto
          • VMC
          • ZTT
    • Physical status
      • Swollen battery
        • Change battery
      • Corroded terminals
  5. SOLAR BOX

    • Terminal status
      • Solar groups no have terminals
        • Install teminals
    • Measure voltage of each solar group
      • < 80 V
        • Before 5:00 p.m.
          • Check if one by one solar panel of this solar group if are broken
            • Replace damaged solar panel
        • After 5:00 p.m
          • Check the next day earlier
            • < 80 V
              • Check if one by one solar panel of this solar group if are broken
                • Replace damaged solar panel
            • > 80 v
              • OK
    • Measure current of each solar group
      • 0 A
        • Before 5:00 p.m.
          • Check if one by one solar panel of this solar group if are broken
            • Replace damaged solar panel
        • After 5:00 p.m
          • Check the next day earlier
            • 0 A
              • Check if one by one solar panel of this solar group if are broken
                • Replace damaged solar panel
            • >0 A
              • OK
    • Physical status
      • Damaged solar box (broken, corroded)
        • Replace solar box
  6. SOLAR PANELS

    • Physical status
      • Damaged solar panels
        • Replace solar panels
    • Connector status
      • Wrong connections
        • Fix connection
      • Damaged cable
        • Replace cable
    • Clean solar panels
      • Take photo before cleaning
      • Take photo during cleaning
      • Take photo after cleaning
  7. GENERATOR

    • Data plate
      • Take photo of generator data
    • Fuel level
      • Check if generator has enough fuel
        • Missing fuel
          • Refill fuel
        • Enough fuel
          • OK
    • Operation
      • Check if generator runs
        • Run
          • OK
        • No run
          • Check with NOC

Informações

Descrição
Mapa Mental sobre SOLAR MAINTENANCE, criado por Luis Arturo Membrillo Pillpe em 27-01-2025.
Visualizações
4
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?