Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Mapa mental

SAB8 #47 Controlling Scope

Jorge Ponce Nuevo estudio Espanhol

Conteúdo do mapa

SAB8 #47 Controlling Scope

  1. Variance analysis

    • This means comparing the data can be collected about the work being done to the baseline. When there is a difference between the two, that’s variance
  2. Actualiza

    • Scope
    • Project Management Plan
    • Baseline
    • WBS (Work Breakdown Structure)
    • WBS Dictionary
  3. It’s how you make sure that you make only those changes to the scope that you need to make, an that everyone is clear on what the consequences of those changes are.

  4. Scope Management Plan

    • Check the Scope Management plan to figure out how to handle the change

Informações

Descrição
Nuevo estudio Mapa Mental sobre SAB8 #47 Controlling Scope, criado por Jorge Ponce em 25-11-2015.
Criado por
Jorge Ponce
Visualizações
19
Avaliação

Mais sobre Control Scope

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?