Mind map
SAB8 #47 Controlling Scope
Map content
SAB8 #47 Controlling Scope
Variance analysis
- This means comparing the data can be collected about the work being done to the baseline. When there is a difference between the two, that’s variance
Actualiza
- Scope
- Project Management Plan
- Baseline
- WBS (Work Breakdown Structure)
- WBS Dictionary
It’s how you make sure that you make only those changes to the scope that you need to make, an that everyone is clear on what the consequences of those changes are.
Scope Management Plan
- Check the Scope Management plan to figure out how to handle the change
Information
- Description
- Nuevo estudio Mind Map on SAB8 #47 Controlling Scope, created by Jorge Ponce on 25/11/2015.
- Created by
- Jorge Ponce
- Views
- 19
- Rating