Sab9#43y44_Scope Levels_Category Requirements(Modified)

  1. Scope Levels

    • Activity
      • These are the actions or tasks to be performed in a work package
    • Work Package
      • It consists of a set of activities or tasks to be performed
      • Segundo Nivel, pueden haber paquetes de planeacion
    • Control Account
      • it is made up of a set of work packages which analyzes the scope, time and cost to a higher level
      • Nivel Mas Alto Controla Costos
  2. Category Requirements

    • Business
      • need for high level of the company
    • Stakeholders
      • need for a person or group
    • Functional
      • product performance
    • Nonfunctional
      • environmental conditions required to produce the product
    • Transition
      • need to adapt to operate the product
    • Project
      • Processes and devices required to operate the project
    • Quality
      • criteria necessary to meet project requirements
    • Technical
      • Definition of how the product will be built
    • PREGUNTA DE EXAMEN : en que documento aparecen estas categorias ?? , en la matriz de trazabilidad !! y es mas facil identificar a los stakeholders

Informações

Descrição
PMP Taller de Certificación PMI Mapa Mental sobre Sab9#43y44_Scope Levels_Category Requirements(Modified), criado por Roman Velasquez em 19-04-2016.
Criado por
Roman Velasquez
Visualizações
0
Histórico
  • Criado por Jou M · 19 abr 2016
  • Copiado por Roman Velasquez · 19 abr 2016