Scope Levels
- Activity
- These are the actions or tasks to be performed in a work package
- Work Package
- It consists of a set of activities or tasks to be performed
- Segundo Nivel, pueden haber paquetes de planeacion
- Control Account
- it is made up of a set of work packages which analyzes the scope, time and cost to a higher level
- Nivel Mas Alto Controla Costos
- Activity
Category Requirements
- Business
- need for high level of the company
- Stakeholders
- need for a person or group
- Functional
- product performance
- Nonfunctional
- environmental conditions required to produce the product
- Transition
- need to adapt to operate the product
- Project
- Processes and devices required to operate the project
- Quality
- criteria necessary to meet project requirements
- Technical
- Definition of how the product will be built
- PREGUNTA DE EXAMEN : en que documento aparecen estas categorias ?? , en la matriz de trazabilidad !! y es mas facil identificar a los stakeholders
- Business
Información
- Descripción
- PMP Taller de Certificación PMI Mapa Mental sobre Sab9#43y44_Scope Levels_Category Requirements(Modified), creado por Roman Velasquez el 19/04/2016.
- Creado por
- Roman Velasquez
- Visitas
- 0
- Historial
-
- Creado por Jou M · 19 abr 2016
- Copiado por Roman Velasquez · 19 abr 2016
- Valoración
Más sobre Collect Requirements