CASE STUDY: River Valency, Boscastle, Flash Flood August 2004
Conteúdo do mapa
CASE STUDY: River Valency, Boscastle, Flash Flood August 2004
CAUSES
- Natural Factors
- The summer of 2004 had been unusually wet and the ground was saturated. On the 16th August a very intense rainstorm fell on the are caused by the remnants of a hurricane from the Caribbean. 1400mm of rain fell in 2 hours, 200 000 litres per second.
- The hills around the village are impermeable rock, steep sided and covered with grass.
- This heavy rain could not infiltrate the ground so rapid surface run-off occurred
- Human Factors
- The flood risk was increased due to the amount of buildings alongside the river and also the construction of small bridges across it.
- The small bridges trapped material swept down the river creating a 'dam-like' effect.
- Natural Factors
EFFECTS
- River levels rose by 2 metres in 1 hour. A 3m surge carried cars and other debris through the village.
- 25 business properties were destroyed and 50 buildings and houses were flood damaged
- Insurance companies paid out an estimate of £20 million to repair property. The visitor centre was destroyed and 4 footbridges washed away.
RESPONSES
- £4.6 million flood defence scheme completer in 2008.
- Defence walls have been strengthened
- The channel has been widened to allow much higher peak discharge. A wider bridge replaces the old one
- Trees have been removed close to the river to prevent branches blocking the channel.
- A new car park has been built which is a storey car park and raised off the ground. A new sewage pumping station is being constructed as well.
Informações
- Descrição
- GCSE Geography Mapa Mental sobre CASE STUDY: River Valency, Boscastle, Flash Flood August 2004, criado por Laura Elliott-White em 06-12-2016.