6) Construction Surveying

Bianca Kring Construction Surveying 2nd year Inglês

Conteúdo do mapa

6) Construction Surveying

  1. Tertiary control

    • Sight rails
      • Monitor excavation
    • Batter boards
      • Control Slopes
    • Profiles
      • Define the corners&sides of buildings
  2. Area determination

    • Measurement of dimensions
      • Straight sided figures
      • Figures with irregular boundaries
        • Reduction to straight sided figures
    • Coordinates
      • Straight sided figure with n sides
        • Area=½(Y1X2+Y2X3+...+YnX1)-(X1Y2+X2Y3+...+XnY1)
  3. Volume determination

    • From dimensions formulae
    • Spotshots -grid of observation
      • v=A/V(Σsingle depths+2Σdouble depths+3Σtriple depths+4Σquadruple depths)
      • Trapezoidal rule
        • A=D/2(A1+A2+2A3+...+2An)
      • Simpsons rule
        • A=D/3(A1+An+4Aeven+2Aodd)
    • Contours
    • Prismoidal formula
      • V=D/3(A1+A5+4[A2+A4]+2[A3]
        • V=D/3[A1+An+4Aeven+2Aodd]
    • Simpsons rule for Volumes
      • Only applicable to an odd number of sections
      • V=d/3(A1+4A2+2A3+4A4+...+2An-2+4An-1+An)
    • End Areas
      • V=d/2(A1+2A2+2A3+...+2An-1+An)
  4. Mass-Haul diagramm

    • Drawn after earthwork quantities have been calculated
    • Directly below the longitudinal section of the surveyd center line
    • Shows accumulated volume at any point
      • Can find from it: distance over which cut&fill will balance, quantities of material to be moved and their direction, amounts, etc.

Informações

Descrição
2nd year Construction Surveying Mapa Mental sobre 6) Construction Surveying, criado por Bianca Kring em 24-01-2017.
Criado por
Bianca Kring
Visualizações
1
Avaliação

Mais sobre Areas, Volumes and Contours

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?