Mind map: Rivers, floods and management

Conteúdo do mapa

Rivers, Floods and Management 3

  1. Quaggy Restoration Scheme

    • new water park was made to collect water
      • used as a wetland
      • Collects 3 olympic swimming pools worth
    • Reduced to the river being more natural
    • Reduced risk of flooding for 600 houses
  2. Impacts of Flooding

    • People and animals killed
    • Contaminated water from sewage
    • Properties damaged
    • Business shutdown
    • Public transport and roads destroyed
    • Crops destroyed
    • River Sediment deposited on floodplain
    • Wetlands created
  3. Bangladesh Flood 2007

    • Causes
      • Monsoon season came early
      • 169mm of rainfall in 24 hours
      • Long duration of rainfall
      • Deforestation in Nepal meant more discharge
      • Growth of urban areas meant more surface runoff
    • Impacts
      • Long Term
        • 44 Schools destroyed so education lost permanently
        • 550000 hectares could not be used again due to fertility
        • Unemployment because factories had to repay damage
      • Short Term
        • 2000 people died
        • 110000 people lost houses
        • 25 million made homeless
        • Livestock were lost
  4. Flood Management strategies

    • Hard Engineering
      • Dams
        • Large walls built across a river. forms a reservoir behind it. often use turbines to produce electricity. provides job opportunities. Are very expensive. affect habitats for humans and animals
      • Channel Straightening
        • Meanders are removed, meaning water flows down faster. often causes more issues down stream is water occurs there quicker. also disturbs wildlife habitats
      • Levees
        • Raised embankments, allows more water to be held. Quite expensive and if breached severe flooding could happen
    • Soft Engineering
      • River Restoration
        • Making the river more natural. little maintenance is needed, local flood risk can be increased but habitats are created.
      • Urban Surface alternation
        • Building porous pavements. water can infiltrate easier so discharge decreases. EXPENSIVE!!
      • Land use Management
        • Planning restrictions to prevent building from being in floodplain areas. also reduces infiltration but it restricts development
  5. Carlisle Flood 2005

    • Causes
      • Heavy rainfall
      • Large Built up area so surface runoff is very high
      • Drains and sewage systems overflowed in some areas
    • Impacts
      • Short Term
        • 3 people died
        • over 3000 people made homeless
        • 350 businesses had to shutdown
      • Long Term
        • took over a year to repair at 100million
        • 4 schools severely flooded, people lost out on education
        • Stress related illnesses increased
  6. Three Gorges Dam

    • Positive Effects
      • Reduced major flooding from once every ten years to once every 100
      • Provides 3% of Chinas demand for electricity
      • Safer to navigate shipping through
    • Negative Effects
      • 1.3 million people had to relocate people
      • Dam will trap sediment and then causes catastrophic effect
      • Reduced food supply for animals in river
    • 1958 flood, causes 33000 people to die and 18 million people had to move

Informações

Descrição
Mapa Mental sobre Rivers, Floods and Management 3, criado por merrettn em 08-05-2014.
Criado por
merrettn
Visualizações
32
Avaliação

Mais sobre Flood Case Study Comparisons

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?