Quaggy Restoration Scheme
- new water park was made to collect water
- used as a wetland
- Collects 3 olympic swimming pools worth
- Reduced to the river being more natural
- Reduced risk of flooding for 600 houses
- new water park was made to collect water
Impacts of Flooding
- People and animals killed
- Contaminated water from sewage
- Properties damaged
- Business shutdown
- Public transport and roads destroyed
- Crops destroyed
- River Sediment deposited on floodplain
- Wetlands created
Bangladesh Flood 2007
- Causes
- Monsoon season came early
- 169mm of rainfall in 24 hours
- Long duration of rainfall
- Deforestation in Nepal meant more discharge
- Growth of urban areas meant more surface runoff
- Impacts
- Long Term
- 44 Schools destroyed so education lost permanently
- 550000 hectares could not be used again due to fertility
- Unemployment because factories had to repay damage
- Short Term
- 2000 people died
- 110000 people lost houses
- 25 million made homeless
- Livestock were lost
- Long Term
- Causes
Flood Management strategies
- Hard Engineering
- Dams
- Large walls built across a river. forms a reservoir behind it. often use turbines to produce electricity. provides job opportunities. Are very expensive. affect habitats for humans and animals
- Channel Straightening
- Meanders are removed, meaning water flows down faster. often causes more issues down stream is water occurs there quicker. also disturbs wildlife habitats
- Levees
- Raised embankments, allows more water to be held. Quite expensive and if breached severe flooding could happen
- Dams
- Soft Engineering
- River Restoration
- Making the river more natural. little maintenance is needed, local flood risk can be increased but habitats are created.
- Urban Surface alternation
- Building porous pavements. water can infiltrate easier so discharge decreases. EXPENSIVE!!
- Land use Management
- Planning restrictions to prevent building from being in floodplain areas. also reduces infiltration but it restricts development
- River Restoration
- Hard Engineering
Carlisle Flood 2005
- Causes
- Heavy rainfall
- Large Built up area so surface runoff is very high
- Drains and sewage systems overflowed in some areas
- Impacts
- Short Term
- 3 people died
- over 3000 people made homeless
- 350 businesses had to shutdown
- Long Term
- took over a year to repair at 100million
- 4 schools severely flooded, people lost out on education
- Stress related illnesses increased
- Short Term
- Causes
Three Gorges Dam
- Positive Effects
- Reduced major flooding from once every ten years to once every 100
- Provides 3% of Chinas demand for electricity
- Safer to navigate shipping through
- Negative Effects
- 1.3 million people had to relocate people
- Dam will trap sediment and then causes catastrophic effect
- Reduced food supply for animals in river
- 1958 flood, causes 33000 people to die and 18 million people had to move
- Positive Effects
Información
- Descripción
- Mapa Mental sobre Rivers, Floods and Management 3, creado por merrettn el 08/05/2014.
- Creado por
- merrettn
- Visitas
- 32
- Valoración
Más sobre Flood Case Study Comparisons