O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Carla Sotil Chauca Espanhol

PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Conteúdo do mapa

PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

  1. DEFINITION

    • COMMON USING TERMS
      • WORK
        • Deliverables that are the result of effort
      • BREAKDOWN
        • Divition in parts
      • STRUCTURE
        • Something arranged
          • in a definite pattern organization
      • OTHER TERMS
      • THE DEFINITION TERMS
        • facilitate understanding
          • of the integral role the WBS plays
            • in project management practice
    • CONCEPT
      • DELIVERABLES
        • Any unique and verifiable product, result, or capability
          • DELIVERABLES ORENTED WBS BENEFITS
            • Better communication
            • More accurate estimation
            • Increased confidence
            • A foundation for the control
      • DESIGN
        • Provides a graphical representatio of the Project scope
      • ORGANIZATIONAL PERSPECTIVE
        • Defined clearly organizational responsabilities
      • MANAGEMENT
        • WBS support effective Project management
      • WBS LEVELS
        • Depend upon the size and complexity
    • CHARACTERISTICS FROM THE DICTIONARY DEFINITION
      • Supports the definition of all work required
        • to achieve an objective
      • illustrate and define the hierarchy of deliverables.
        • organized into ‘‘parent-child’’ relationships.
      • Has an objective or tangible result
    • THE 100% RULE
      • is a core characteric
      • captures ALL deliverable deliverables
      • includes 100% of the work
        • defined by the project scope
    • REPRESENTATION OF WBS
    • EXAMPLE: CONSTRUCTION A BIKE
  2. IMPORTANCE

    • INTEGRATION WITH PROJECT MANAGEMENT PROCESSES
      • WBS plays an integral role
        • in other project management processes
    • RELATIONSHIP TO OTHER TOOLS
      • PROJECT MANAGEMENT TOOLS
        • PROYECT CHARTER
          • takes the project charter as its starting point
        • PROJECT SCOPE STATEMENT
          • Describe
        • PROGRAM AND PORTFOLIO WBS
          • Can be used to define scope for projects, programs, and portfolios
        • THE RESOURCE BREAKDOWN STRUCTURE
          • In conjunction with the WBS
            • to define work package assignments.
        • ORGANIZATIONAL BREAKDOWN STRUCTURE
          • Reinforces the guideline
        • WBS DICTIONARY
          • accompanies the WBS and carries critical project information
        • PROJECT SCHEDULE NETWORK DIAGRAM
          • is a sequential arrangement of the work defined by the WBS
          • essential to uncovering project dependencies and risks.
        • PROJECT SCHEDULE
          • The various elements of the WBS
            • are used as starting points
              • for defining the activities
      • WPS DEVELOPMENT TOOLS
        • Promote and enforce
          • the principles of the WBS standard
        • promote
          • Consistency and Repeatability
        • Reduce
          • the development effort
    • WBS INTEGRATION AND USE BY OTHER STANDARS
      • Identifies the WBS as a tool that can be used to develop a program WBS.
      • The Standard for Portfolio Management
      • The Standard for Program Management
  3. WBS QUALITY DEFINITION

    • PRINCIPLES
      • PRINCIPLE 1
        • Satisfies all of the requirements for its use in a project
        • Sub Principle 1
          • Describe
            • a set of 16 core characteristics
              • that must be present in every WBS
                • to satisfy project needs
        • Sub Principle 2
          • Define
            • a set of 7 use realated characteristics
              • that can vary
                • from one WBS to another
      • PRINCIPLE 2
        • WBS quality characteristics apply
          • at all levels of scope definition.
            • differ only in
              • the content
              • the scope
    • PROBLEM DIAGNOSTIC CHECK LIST
      • There are abou 7
        • Project problem
          • resulting from WBS keys defects
    • EXAMPLE OF HIGH QUALITY
      • LEVEL 1
        • comprises the full scope of work
          • necessary to produce the bicycle
      • LEVEL 3
        • integration is decomposed
          • into interim deliverables
      • LEVEL 2
        • The first level of decomposition
      • LEVEL 4
        • testing into 3 descpmponent elements
          • Customer test
          • Component test is pre-assembly testing
          • Product test is quality control and pre customer test
  4. INTRUDUCTION

    • OBJECTIVES
      • to provide a common ground
        • for understanding the concepts and benefits of the WBS
      • to present a standard application
        • of the WBS as a project management too

Imagens e arquivos do mapa

  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Informações

Descrição
Mapa Mental sobre PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES, criado por Carla Sotil Chauca em 15-04-2018.
Visualizações
0
Avaliação

Mais sobre Project Scope Management

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?