PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Carla Sotil Chauca Spanish

PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Map content

PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

  1. DEFINITION

    • COMMON USING TERMS
      • WORK
        • Deliverables that are the result of effort
      • BREAKDOWN
        • Divition in parts
      • STRUCTURE
        • Something arranged
          • in a definite pattern organization
      • OTHER TERMS
      • THE DEFINITION TERMS
        • facilitate understanding
          • of the integral role the WBS plays
            • in project management practice
    • CONCEPT
      • DELIVERABLES
        • Any unique and verifiable product, result, or capability
          • DELIVERABLES ORENTED WBS BENEFITS
            • Better communication
            • More accurate estimation
            • Increased confidence
            • A foundation for the control
      • DESIGN
        • Provides a graphical representatio of the Project scope
      • ORGANIZATIONAL PERSPECTIVE
        • Defined clearly organizational responsabilities
      • MANAGEMENT
        • WBS support effective Project management
      • WBS LEVELS
        • Depend upon the size and complexity
    • CHARACTERISTICS FROM THE DICTIONARY DEFINITION
      • Supports the definition of all work required
        • to achieve an objective
      • illustrate and define the hierarchy of deliverables.
        • organized into ‘‘parent-child’’ relationships.
      • Has an objective or tangible result
    • THE 100% RULE
      • is a core characteric
      • captures ALL deliverable deliverables
      • includes 100% of the work
        • defined by the project scope
    • REPRESENTATION OF WBS
    • EXAMPLE: CONSTRUCTION A BIKE
  2. IMPORTANCE

    • INTEGRATION WITH PROJECT MANAGEMENT PROCESSES
      • WBS plays an integral role
        • in other project management processes
    • RELATIONSHIP TO OTHER TOOLS
      • PROJECT MANAGEMENT TOOLS
        • PROYECT CHARTER
          • takes the project charter as its starting point
        • PROJECT SCOPE STATEMENT
          • Describe
        • PROGRAM AND PORTFOLIO WBS
          • Can be used to define scope for projects, programs, and portfolios
        • THE RESOURCE BREAKDOWN STRUCTURE
          • In conjunction with the WBS
            • to define work package assignments.
        • ORGANIZATIONAL BREAKDOWN STRUCTURE
          • Reinforces the guideline
        • WBS DICTIONARY
          • accompanies the WBS and carries critical project information
        • PROJECT SCHEDULE NETWORK DIAGRAM
          • is a sequential arrangement of the work defined by the WBS
          • essential to uncovering project dependencies and risks.
        • PROJECT SCHEDULE
          • The various elements of the WBS
            • are used as starting points
              • for defining the activities
      • WPS DEVELOPMENT TOOLS
        • Promote and enforce
          • the principles of the WBS standard
        • promote
          • Consistency and Repeatability
        • Reduce
          • the development effort
    • WBS INTEGRATION AND USE BY OTHER STANDARS
      • Identifies the WBS as a tool that can be used to develop a program WBS.
      • The Standard for Portfolio Management
      • The Standard for Program Management
  3. WBS QUALITY DEFINITION

    • PRINCIPLES
      • PRINCIPLE 1
        • Satisfies all of the requirements for its use in a project
        • Sub Principle 1
          • Describe
            • a set of 16 core characteristics
              • that must be present in every WBS
                • to satisfy project needs
        • Sub Principle 2
          • Define
            • a set of 7 use realated characteristics
              • that can vary
                • from one WBS to another
      • PRINCIPLE 2
        • WBS quality characteristics apply
          • at all levels of scope definition.
            • differ only in
              • the content
              • the scope
    • PROBLEM DIAGNOSTIC CHECK LIST
      • There are abou 7
        • Project problem
          • resulting from WBS keys defects
    • EXAMPLE OF HIGH QUALITY
      • LEVEL 1
        • comprises the full scope of work
          • necessary to produce the bicycle
      • LEVEL 3
        • integration is decomposed
          • into interim deliverables
      • LEVEL 2
        • The first level of decomposition
      • LEVEL 4
        • testing into 3 descpmponent elements
          • Customer test
          • Component test is pre-assembly testing
          • Product test is quality control and pre customer test
  4. INTRUDUCTION

    • OBJECTIVES
      • to provide a common ground
        • for understanding the concepts and benefits of the WBS
      • to present a standard application
        • of the WBS as a project management too

Images and files in the map

  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
  • PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Information

Description
Mind Map on PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES, created by Carla Sotil Chauca on 15/04/2018.