O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

PREFABRICATION

Mohammed Nihal Inglês

Conteúdo do mapa

PREFABRICATION

  1. LOGISTICS

    • ARRIVAL OF MATERIAL
    • LOADING PROCEDURE
      • RISK AND MITIGATION
    • TRANSPORT
    • UNCERTAINTY
  2. DESIGN

    • DESIGN DEVELOPMENT
      • COST
      • STRENGTH REQUIREMENT
    • PRE DESIGN
    • DESIGN DOCUMENTS
      • PERMIT AND APPROVAL
    • REQUIREMENT
      • STANDARDS
      • SITE MEASUREMENT
    • BUILDING TYPE
    • SUSTAINABLE DESIGN
  3. OFF-SITE MANUFACTURE

    • MOULD
    • PROCESSING MEHODS
      • MAINTENANCE AND SERVICE
    • COMPONENTS
    • INSPECTION
      • DISTRIBUTION
    • TECHNOLOGY
    • LABOUR RISK
  4. ON-SITE ASSEMBLY

    • INSPECTION
    • ON-SITE STORAGE
      • DAMAGE AND RISK
    • INSTALLATION
    • PROCESSING AND REURN
    • SKILLED LABOUR
    • TEMPORARY BRACING
    • PROJECT DELIVERY
  5. MARKET ANALYSIS

  6. GOVERMENT POLICIES

  7. PROFIT AND LOSS

  8. FEASIBILITY

  9. PRODUCTIVITY

  10. ISSUES

  11. FUTURE POTENTIAL

  12. CONSTRUCTION WASTE

    • RECYCLE

Informações

Descrição
Mapa Mental sobre PREFABRICATION, criado por Mohammed Nihal em 09-12-2018.
Criado por
Mohammed Nihal · dez 2018
Atualizado
9 dez 2018
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?